[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167999":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1167999,830,2,"多选题","必须消耗的时间包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","与施工组织和技术上的缺点有关的时间消耗",false,{"key":16,"text":17,"correct":18},"B","由于施工工艺特点引起的工作中断所消耗的时间",true,{"key":20,"text":21,"correct":18},"C","有效工作时间",{"key":23,"text":24,"correct":18},"D","休息时间",{"key":26,"text":27,"correct":14},"E","与施工工艺无关的工作中断所消耗的时间","BCD","必须消耗的时间包括有效工作时间、不可避免的中断时间和休息时间。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)专业管理实务 岗位知识","建筑工程",0]