[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167925":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167925,830,1,"单选题","反映总承包商是否按规定及时结算和支付劳务分包费用的依据是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","劳务费结算台账和支付凭证",false,{"key":16,"text":17,"correct":18},"B","支付凭证和劳务分包合同",true,{"key":20,"text":21,"correct":14},"C","劳务备案手续和劳务分包合同",{"key":23,"text":24,"correct":14},"D","劳务分包合同和劳务费结算台账","反映总承包商是否按规定及时结算和支付劳务分包费用的依据是支付凭证和劳务分包合同。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]