[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167924":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1167924,830,1,"单选题","分包单位自行采购的物资，必须在（ ）指定合格分供方范围内采购，进场经总包验收合格后，各种质量证明资料报总包物资管理部门备案。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","业主",{"key":19,"text":20,"correct":21},"C","总包",true,{"key":23,"text":24,"correct":14},"D","分包","分包单位自行采购的物资，必须在总包指定合格分供方范围内采购，进场经总包验收合格后，各种质量证明资料报总包物资管理部门备案。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]