[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167915":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167915,830,1,"单选题","为了全面反映建筑企业生产工人的全部劳动资源的利用情况，分析未被利用的原因，以便改善劳动管理，充分利用劳动资源，可以在（ ）核算的基础上编制劳动时平衡表。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","实际工作时间",false,{"key":16,"text":17,"correct":18},"B","劳动时间",true,{"key":20,"text":21,"correct":14},"C","有效劳动时间",{"key":23,"text":24,"correct":14},"D","实际生产时间","为了全面反映建筑企业生产工人的全部劳动资源的利用情况，分析未被利用的原因，以便改善劳动管理，充分利用劳动资源，可以在劳动时间核算的基础上编制劳动时平衡表。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]