[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167911":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167911,830,1,"单选题","项目部劳务管理人员必须要求施工队伍负责人在人员进场后3日内，将务工人员（ ）进行审核，劳务分包合同签订后7日内办理人员注册备案手续。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","身份证",false,{"key":16,"text":17,"correct":18},"B","上岗证书",true,{"key":20,"text":21,"correct":14},"C","户口",{"key":23,"text":24,"correct":14},"D","花名册","项目部劳务管理人员必须要求施工队伍负责人在人员进场后3日内，将务工人员上岗证书进行审核，劳务分包合同签订后7日内办理人员注册备案手续。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]