[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167893":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1167893,830,1,"单选题","劳务队伍管理人员请假必须经劳务分包项目经理和（ ）的批准，在“去向板”上填写去向。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","劳务作业人员",false,{"key":16,"text":17,"correct":14},"B","项目部管理人员",{"key":19,"text":20,"correct":21},"C","项目部劳务员",true,{"key":23,"text":24,"correct":14},"D","项目部项目经理","需要强调的是劳务队伍管理人员请假必须经劳务分包项目经理和项目部劳务员的批准。与承包项目部管理人员一样，在“去向板”上填写去向。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]