[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167882":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167882,830,1,"单选题","（ ）根据不同情况分别填写结算单签字，其中工程分包单位项目后附完成确认单、各部门意见会签单、审核预算书、并报区域公司或总包商合约部审查。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程部门",false,{"key":16,"text":17,"correct":18},"B","预算部门",true,{"key":20,"text":21,"correct":14},"C","财务部门",{"key":23,"text":24,"correct":14},"D","人事部门","预算部门根据不同情况分别填写结算单签字，其中工程分包单位项目后附完成确认单、各部门意见会签单、审核预算书、并报区域公司或总包商合约部审查。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]