[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167845":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1167845,830,1,"单选题","分包单位于每月23日（或按照项目规定的日期），申请项目主管分包的（ ）对其当月完成的工程项目及施工到达的部位进行签认，填写《完成工程项目及工程量确定单》。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","劳务作业人员",false,{"key":16,"text":17,"correct":14},"B","相关负责人",{"key":19,"text":20,"correct":21},"C","现场工程责任人",true,{"key":23,"text":24,"correct":14},"D","劳务员","分包单位于每月23日（或按照项目规定的日期），申请项目主管分包的现场工程责任人对其当月完成的工程项目及施工到达的部位进行签认，填写《完成工程项目及工程量确定单》。并将《完成工程项目及工程量确定单》作为月度工程量统计表的附件报给项目预算部门。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]