[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167836":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1167836,830,1,"单选题","工程项目未完工，劳务分包企业追加使用农民工或预留资金被启用的，承包人应当按照本账户标准的规定，在（ ）内补齐账户中的资金。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","5天",false,{"key":16,"text":17,"correct":14},"B","1天",{"key":19,"text":20,"correct":14},"C","28天",{"key":22,"text":23,"correct":24},"D","30天",true,"工程项目未完工，劳务分包企业追加使用农民工或预留资金被启用的，承包人应当按照本账户标准的规定，在30日内补齐账户中的资金。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]