[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167834":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167834,830,1,"单选题","包工包料及劳务分包单位或扩大劳务的分包单位，于每月25日（工程量统计周期为上月24日至本月23日或按照项目规定的日期）或结算期，根据双方约定的内容编制月预算统计结算书，由（ ）签字并加盖公章，报项目经理部预算部门审核。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","劳务作业人员",false,{"key":16,"text":17,"correct":18},"B","相关负责人",true,{"key":20,"text":21,"correct":14},"C","现场工程责任人",{"key":23,"text":24,"correct":14},"D","劳务员","包工包料及劳务分包单位或扩大劳务的分包单位，于每月25日（工程量统计周期为上月24日至本月23日或按照项目规定的日期）或结算期，根据双方约定的内容编制月预算统计结算书，由相关负责人签字并加盖公章，报项目经理部预算部门审核。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]