[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167829":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167829,830,1,"单选题","每次结算劳务费时，（ ）应编制劳务人员工资表。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","带班班长",false,{"key":16,"text":17,"correct":18},"B","劳务负责人",true,{"key":20,"text":21,"correct":14},"C","项目部劳务员",{"key":23,"text":24,"correct":14},"D","项目部项目经理","每次结算劳务费时，项目劳务负责人应编制劳务人员工资表；劳务负责人在每月申领劳务工资时，必须提供上月已发的且有劳务人员本人签字以及劳务负责人签字、相关劳务企业盖章的工资单报给项目部劳务员备案，以鉴定劳务工资是否发给了员工本人。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]