[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167827":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1167827,830,1,"单选题","承包人负责审核劳务分包企业分包合同签订、备案情况，审核劳务费结算情况；根据（ ）制定兑付方案，决定支付额度。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预留资金情况",true,{"key":16,"text":17,"correct":18},"B","财务状况",false,{"key":20,"text":21,"correct":18},"C","工程量完成情况",{"key":23,"text":24,"correct":18},"D","劳务费结算情况","承包人负责审核劳务分包企业分包合同签订、备案情况，审核劳务费结算情况;根据预留资金情况制定兑付方案，决定支付额度。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]