[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167752":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1167752,830,1,"单选题","造成履约范围不清的主要原因是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分包合同条款内容不规范、不具体",true,{"key":16,"text":17,"correct":18},"B","合同双方当事人对工程情况不熟悉",false,{"key":20,"text":21,"correct":18},"C","合同双方当事人对法律知识不了解",{"key":23,"text":24,"correct":18},"D","合同双方当事人未按照合同示范文本执行","造成履约范围不清的主要原因是分包合同条款内容不规范、不具体。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]