[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167731":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1167731,830,1,"单选题","下列各项中，不属于选择建设工程施工分包合同形式主要因素的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程量大小",false,{"key":16,"text":17,"correct":14},"B","工期长短",{"key":19,"text":20,"correct":21},"C","劳务用工多少",true,{"key":23,"text":24,"correct":14},"D","造价高低","在订立建设施工合同时，就要根据工程大小，工期长短，造假的高低，涉及其他因素多寡选择合同形式。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]