[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167697":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1167697,830,1,"单选题","分包单位的专职（ ）对本单位施工过程行使质量否决权。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量检查员",true,{"key":16,"text":17,"correct":18},"B","施工技术员",false,{"key":20,"text":21,"correct":18},"C","分包负责人",{"key":23,"text":24,"correct":18},"D","安全员","分包单位的专职质量检查员对本单位施工过程行使质量否决权。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]