[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167688":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1167688,830,1,"单选题","分包单位每月必须向总包商项目经理部物资管理部门按要求报送（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","月材料采购计划",true,{"key":16,"text":17,"correct":18},"B","月劳动力使用报表",false,{"key":20,"text":21,"correct":18},"C","月施工作业统计",{"key":23,"text":24,"correct":18},"D","月计划考核","分包单位每月必须向总包商项目经理部物资管理部门按要求报送月材料采购计划。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]