[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167679":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1167679,830,1,"单选题","劳务分包人应向承包人提交项目负责人与劳务分包人之间的（ ），以及劳务分包人为项目负责人缴纳社会保险的有效证明。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","聘任文件",false,{"key":16,"text":17,"correct":14},"B","学历和职称",{"key":19,"text":20,"correct":14},"C","该负责人简历",{"key":22,"text":23,"correct":24},"D","劳动合同",true,"项目负责人应是劳务分包人正式聘用的员工，劳务分包人应向承包人提交项目负责人与劳务分包人之间的劳动合同，以及劳务分包人为项目负责人缴纳社会保险的有效证明。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]