[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167630":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1167630,830,1,"单选题","总包单位协助劳务分包企业处理劳务纠纷的依据是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","劳务费结算台账",false,{"key":16,"text":17,"correct":14},"B","支付凭证",{"key":19,"text":20,"correct":21},"C","劳务人员的工资表、考勤表",true,{"key":23,"text":24,"correct":14},"D","工资台账","劳务作业人员的工资表和考勤表，是劳务分包企业进场作业人员实际发生作业行为工资分配的证明。也是总包单位协助劳务分包企业处理劳务纠纷的依据。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]