[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167575":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167575,830,1,"单选题","全部分包工作完成后，经劳务作业发包人认可后（ ）天内，劳务作业承包人向劳务作业发包人递交完整的结算资料，双方按照本合同约定的计价方式，进行劳务报酬的最终支付。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":18},"B","14",true,{"key":20,"text":21,"correct":14},"C","21",{"key":23,"text":24,"correct":14},"D","30","全部分包工作完成后，经劳务作业发包人认可后14天内，劳务作业承包人向劳务作业发包人递交完整的结算资料，双方按照本合同约定的计价方式，进行劳务报酬的最终支付。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]