[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167515":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167515,830,1,"单选题","由于设计变更或其他情况，往往会产生工程量的变化。（ ）应根据劳务净需求的新增（减）部分，制定具体的补充或调剂计划。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","公司劳务主管部门",false,{"key":16,"text":17,"correct":18},"B","项目部",true,{"key":20,"text":21,"correct":14},"C","施工劳务企业",{"key":23,"text":24,"correct":14},"D","劳务队伍","由于设计变更或其他情况，往往会产生工程量的变化。项目部应根据劳务净需求的新增（减）部分，制定具体的补充或调剂计划。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]