[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167495":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1167495,830,1,"单选题","劳动用工相关计算指标不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","计划平均人数",false,{"key":16,"text":17,"correct":14},"B","计划工资总额",{"key":19,"text":20,"correct":14},"C","劳动定额完成情况",{"key":22,"text":23,"correct":24},"D","计划用工缺口",true,"劳动用工相关计算指标主要有：计划平均人数、计划工资总额、计划工人劳动生产率、劳动定额完成情况。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]