[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167455":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167455,830,1,"单选题","按施工过程（ ）不同分类，可以分为个人完成的过程、工人班组完成的过程和施工队完成的过程。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","完成方法",false,{"key":16,"text":17,"correct":18},"B","劳动分工的特点",true,{"key":20,"text":21,"correct":14},"C","组织上复杂程度",{"key":23,"text":24,"correct":14},"D","劳动组织的难易程度","2.1.2施工过程的概念条例：按施工过程劳动分工的特点不同分类，可以分为个人完成的过程、工人班组完成的过程和施工队完成的过程。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]