[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167453":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1167453,830,1,"单选题","以下过程不属于按施工过程组织的复杂程度分类的是：（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工序过程",false,{"key":16,"text":17,"correct":14},"B","工作过程",{"key":19,"text":20,"correct":21},"C","个人完成的过程",true,{"key":23,"text":24,"correct":14},"D","综合工作过程","2.1.2施工过程的概念条例：按施工过程组织上复杂程度分类，可以分为工序过程、工作过程和综合工作过程。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]