[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167450":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167450,830,1,"单选题","有效工作时间包括基本工作时间、辅助工作时间和（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","必要的休息时间",false,{"key":16,"text":17,"correct":18},"B","准备与结束工作时间",true,{"key":20,"text":21,"correct":14},"C","不可避免的中断时间",{"key":23,"text":24,"correct":14},"D","偶然的损失时间","有效工作时间是从生产效果来看与产品生产直接有关的时间消耗，包括基本工作时间、辅助工作时间和准备与结束工作时间。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]