[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167445":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1167445,830,1,"单选题","按定额标定的对象不同，劳动定额又分为单项工序定额、综合定额。下表为砖基础砌体劳动定额（计量单位：m）。 根据上表，厚度1.5砖的综合产量定额为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","2.34m3",false,{"key":16,"text":17,"correct":14},"B","0.86m3",{"key":19,"text":20,"correct":14},"C","1.2m3",{"key":22,"text":23,"correct":24},"D","1.16m3",true,"根据上表可知：厚度1.5砖的综合产量定额为1.16m3",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]