[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167444":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167444,830,1,"单选题","从施工组织的角度看，（ ）是组成施工过程的基本单元。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工序过程",false,{"key":16,"text":17,"correct":18},"B","工作过程",true,{"key":20,"text":21,"correct":14},"C","工序过程和工作过程",{"key":23,"text":24,"correct":14},"D","综合工作过程","2.1.2施工过程的概念条例：从施工组织的角度看，工作过程是组成施工过程的基本单元。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]