[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167433":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1167433,830,1,"单选题","损失时间中不包括：（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","有多余和偶然工作时间",false,{"key":16,"text":17,"correct":18},"B","休息时间",true,{"key":20,"text":21,"correct":14},"C","停工时间",{"key":23,"text":24,"correct":14},"D","违背劳动纪律所引起的工时损失时间","根据2.2工作时间的界定条例：损失时间中包括有多余和偶然工作、停工、违背劳动纪律所引起的工时损失。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)专业管理实务 岗位知识","建筑工程",0]