[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-829-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},829,"(劳务员)基础知识","建筑工程",0,4,50,1143,[13,34,46,58,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,306,318,330,342,354,366,378,390,402,414,426,436,448,460,472,484,496,508,517,529,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1166436,1,"单选题","施工项目的劳动组织不包括下列的（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","劳务输入",false,{"key":24,"text":25,"correct":22},"B","劳动力组织",{"key":27,"text":28,"correct":22},"C","项目经理部对劳务队伍的管理",{"key":30,"text":31,"correct":32},"D","劳务输出",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1166437,"下列各项措施中，不属于施工项目质量控制的措施的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"提高管理、施工及操作人员自身素质",{"key":24,"text":41,"correct":22},"提高施工的质量管理水平",{"key":27,"text":43,"correct":32},"尽可能采用先进的施工技术、方法和新材料、新工艺、新技术，保证进度目标实现",{"key":30,"text":45,"correct":22},"加强施工项目的过程控制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1166438,"下列选项中关于施工项目管理的特点说法错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"对象是施工项目",{"key":24,"text":53,"correct":32},"主体是建设单位",{"key":27,"text":55,"correct":22},"内容是按阶段变化的",{"key":30,"text":57,"correct":22},"要求强化组织协调工作",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1166439,"以下不属于施工项目质量控制措施的是（ ）。",[62,64,65,67],{"key":20,"text":63,"correct":32},"组织措施、技术措施、合同措施、经济措施、信息管理措施等",{"key":24,"text":39,"correct":22},{"key":27,"text":66,"correct":22},"建立完善的质量保证体系",{"key":30,"text":68,"correct":22},"加强原材料质量控制",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":30,"analysis":33},1166440,"以下不属于施工项目管理内容的是（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"施工项目的生产要素管理",{"key":24,"text":76,"correct":22},"组织协调",{"key":27,"text":78,"correct":22},"施工现场的管理",{"key":30,"text":80,"correct":32},"项目的规划设计",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":20,"analysis":33},1166441,"下列选项中关于施工项目的基本规定说法错误的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":32},"施工项目是建设项目或其中的单项工程、单位工程、分部工程、分项工程的施工活动过程",{"key":24,"text":88,"correct":22},"建筑企业是施工项目的管理主体",{"key":27,"text":90,"correct":22},"建筑产品具有多样性、固定性、体积庞大的特点",{"key":30,"text":92,"correct":22},"施工项目的任务范围是由施工合同界定的",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1166442,"下列选项不属于施工准备阶段质量控制的是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"施工组织设计",{"key":24,"text":100,"correct":32},"测量控制",{"key":27,"text":102,"correct":22},"采购质量控制",{"key":30,"text":104,"correct":22},"质量教育与培训",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1166443,"下列施工项目管理程序的排序正确的是（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":32},"投标、签订合同→施工准备→施工→验收交工与结算→用后服务",{"key":24,"text":112,"correct":22},"施工准备→投标、签订合同→施工→验收交工与结算→用后服务",{"key":27,"text":114,"correct":22},"投标、签订合同→施工→施工准备→验收交工与结算→用后服务",{"key":30,"text":116,"correct":22},"投标、签订合同→施工准备→施工→验收交工→用后服务与结算",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1166444,"通常工程项目成本管理过程包括项目：①成本计划、②成本核算、③成本控制、④成本考核、⑤成本预测、⑥成本分析六大任务，其顺序为（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"③①②④⑤⑥",{"key":24,"text":124,"correct":32},"⑤①③②⑥④",{"key":27,"text":126,"correct":22},"③②①⑥④⑤",{"key":30,"text":128,"correct":22},"①⑥③②④⑤",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":30,"analysis":33},1166445,"下列选项中，不属于施工项目目标控制问题的要素的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"施工项目",{"key":24,"text":136,"correct":22},"控制主体",{"key":27,"text":138,"correct":22},"纠偏措施",{"key":30,"text":140,"correct":32},"排除干扰",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":30,"analysis":33},1166446,"以下不属于施工项目安全组织措施的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"建立施工项目安全组织系统",{"key":24,"text":148,"correct":22},"建立与项目安全组织系统相配套的各专业、各部门、各生产岗位的安全责任系统",{"key":27,"text":150,"correct":22},"建立项目经理的安全生产职责及项目班子成员的安全生产职责",{"key":30,"text":152,"correct":32},"技术措施、合同措施、经济措施、信息管理措施等",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1166447,"应重视信息技术（包括相应的软件、局域网、互联网以及数据处理设备等）在进度控制中的应用，属于进度控制措施中的（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"组织措施",{"key":24,"text":160,"correct":32},"管理措施",{"key":27,"text":162,"correct":22},"经济措施",{"key":30,"text":164,"correct":22},"技术措施",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1166448,"在竣工交付验收签字之日起（ ）日内，项目经理部要向企业工程管理部写出项目经理部解体申请报告，同时提出善后留用和遣散人员的名单及时间，经有关部门审核批准后执行。",[169,171,173,175],{"key":20,"text":170,"correct":22},"7",{"key":24,"text":172,"correct":32},"15",{"key":27,"text":174,"correct":22},"21",{"key":30,"text":176,"correct":22},"30",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},1166449,"施工现场管理执行的主要标准包括（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":32},"技术类标准、管理类标准、行为类标准",{"key":24,"text":184,"correct":22},"政策类标准、技术类标准、管理类标准",{"key":27,"text":186,"correct":22},"政策类标准、管理类标准、行为类标准",{"key":30,"text":188,"correct":22},"技术类标准、强制性标准、管理类标准",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1166450,"以下不属于施工资源管理任务的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":32},"规划及报批施工用地",{"key":24,"text":196,"correct":22},"确定资源的分配计划",{"key":27,"text":198,"correct":22},"编制资源进度计划",{"key":30,"text":200,"correct":22},"施工资源进度计划的执行和动态凋整",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1166451,"施工项目经理部的性质可以归纳为相对独立性、综合性和（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":32},"临时性",{"key":24,"text":208,"correct":22},"固定性",{"key":27,"text":210,"correct":22},"可靠性",{"key":30,"text":212,"correct":22},"永久性",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1166452,"安全管理的三全控制是指（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"全方位、全面、全过程",{"key":24,"text":220,"correct":32},"全过程、全员、全面",{"key":27,"text":222,"correct":22},"全天候、全方位、全面",{"key":30,"text":224,"correct":22},"全天候、全员、全过程",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},1166453,"施工现场道路应尽量布置成（ ），以便于车辆运输出人。",[229,231,233,235],{"key":20,"text":230,"correct":32},"环形",{"key":24,"text":232,"correct":22},"曲线形",{"key":27,"text":234,"correct":22},"一字形",{"key":30,"text":236,"correct":22},"直线形",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":30,"analysis":33},1166454,"进行工程项目分解，确定阶段控制目标，是施工项目管理内容中的（ ）的内容之一。",[241,243,245,247],{"key":20,"text":242,"correct":22},"施工项目目标控制",{"key":24,"text":244,"correct":22},"建立施工项目管理组织",{"key":27,"text":246,"correct":22},"施工项目合同管理",{"key":30,"text":248,"correct":32},"编制施工项目管理规划",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1166455,"影响施工项目质量的因素较多，其中（ ）是第一重要因素。",[253,255,257,259],{"key":20,"text":254,"correct":32},"人",{"key":24,"text":256,"correct":22},"材料",{"key":27,"text":258,"correct":22},"机械设备",{"key":30,"text":260,"correct":22},"工艺方法",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1166456,"应对施工现场场容、文明形象管理做出总体策划和部署的部门是（ ）m。",[265,267,269,271],{"key":20,"text":266,"correct":32},"项目经理部",{"key":24,"text":268,"correct":22},"总包单位安全科",{"key":27,"text":270,"correct":22},"分包单位",{"key":30,"text":272,"correct":22},"建设单位",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1166457,"对于施工图纸齐全、任务明确的项目，其材料用量可以按照（ ）方法计算。",[277,279,281,283],{"key":20,"text":278,"correct":32},"直接计算法",{"key":24,"text":280,"correct":22},"间接计算法",{"key":27,"text":282,"correct":22},"比例计算法",{"key":30,"text":284,"correct":22},"经验估算法",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},1166458,"项目管理的最基本的方法论是（ ）的动态控制。",[289,291,293,295],{"key":20,"text":290,"correct":22},"利润目标",{"key":24,"text":292,"correct":22},"安全目标",{"key":27,"text":294,"correct":32},"项目目标",{"key":30,"text":296,"correct":22},"质量目标",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},1166459,"下列措施中，不属于施工项目安全控制的措施的是（ ）。",[301,302,303,304],{"key":20,"text":158,"correct":22},{"key":24,"text":164,"correct":22},{"key":27,"text":160,"correct":32},{"key":30,"text":305,"correct":22},"制度措施",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":30,"analysis":33},1166460,"组织协调的主要目的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"缩短施工周期",{"key":24,"text":313,"correct":22},"提高项目利润",{"key":27,"text":315,"correct":22},"提高施工质量",{"key":30,"text":317,"correct":32},"保证目标实现",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},1166461,"工人甲在某工程上剔凿保护层上的裂缝，由于没有将剔凿所用的工具带到工作面，便回去取工具，行走途中不小心踏上了通道口盖板（通道口尺寸1.3mx1.3m，盖板为104mx1.4m、厚度1mm的镀锌铁皮），铁皮在甲的踩踏下，迅速变形塌落，甲随塌落的盖板掉到首层地面（落差12.35m），经抢救无效于当日死亡。这是一起由于“四口\"防护不到位所引起的伤亡事故。 高处作业是指凡在坠落高度基准面（ ）m以上有可能坠落的高处进行的作业。",[322,324,326,328],{"key":20,"text":323,"correct":22},"1",{"key":24,"text":325,"correct":22},"1.5",{"key":27,"text":327,"correct":32},"2",{"key":30,"text":329,"correct":22},"3",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1166462,"施工项目资源管理的内容包括（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":32},"人力资源管理、材料管理、机械设备管理、技术管理、资金管理",{"key":24,"text":337,"correct":22},"劳动力管理、材料管理、机械设备管理、技术管理、资金管理",{"key":27,"text":339,"correct":22},"人力资源管理、材料管理、机械设备管理、安全管理、资金管理",{"key":30,"text":341,"correct":22},"人力资源管理、材料管理、机械设备管理、技术管理、成本管理",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1166463,"施工项目机械设备管理的环节包括：．①选择、②使用、③保养、④维修、⑤改造、⑥更新，其关键是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"①",{"key":24,"text":349,"correct":32},"②",{"key":27,"text":351,"correct":22},"③",{"key":30,"text":353,"correct":22},"⑥",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1166464,"施工项目成本控制的步骤包括：①纠偏、②分析、③检查、④比较、⑤预测，正确的步骤顺序为（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"④③②①⑤",{"key":24,"text":361,"correct":32},"④②⑤①③",{"key":27,"text":363,"correct":22},"②③④①⑤",{"key":30,"text":365,"correct":22},"②④⑤①③",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1166465,"下列选项中，不属于建立施工项目经理部的基本原则的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"根据所设计的项目组织形式设置",{"key":24,"text":373,"correct":22},"适应现场施工的需要",{"key":27,"text":375,"correct":32},"满足建设单位关于施工项目目标控制的要求",{"key":30,"text":377,"correct":22},"根据施工工程任务需要调整",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":30,"analysis":33},1166466,"下列选项不属于施工现场环境保护主要内容的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"防大气污染措施",{"key":24,"text":385,"correct":22},"防水污染措施",{"key":27,"text":387,"correct":22},"防止噪声污染措施",{"key":30,"text":389,"correct":32},"现场封闭管理",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1166467,"成本计划的类型按其作用可分为（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":32},"竞争性成本计划、指导性成本计划、实施性计划成本",{"key":24,"text":397,"correct":22},"控制性成本计划、指导性成本计划、实施性计划成本",{"key":27,"text":399,"correct":22},"控制性成本计划、指导性成本计划、操作性计划成本",{"key":30,"text":401,"correct":22},"竞争性成本计划、指导性成本计划、目标性计划成本",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},1166468,"施工项目目标控制包括：施工项目进度控制、施工项目质量控制、（ ）、施工项目安全控制四个方面。",[406,408,410,412],{"key":20,"text":407,"correct":22},"施工项目管理控制",{"key":24,"text":409,"correct":32},"施工项目成本控制",{"key":27,"text":411,"correct":22},"施工项目人力控制",{"key":30,"text":413,"correct":22},"施工项目物资控制",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},1166469,"项目技术负责人是在（ ）的领导下，负责项目部施工生产、工程质量、安全生产和机械设备管理工作。",[418,420,422,424],{"key":20,"text":419,"correct":32},"项目部经理",{"key":24,"text":421,"correct":22},"公司法人",{"key":27,"text":423,"correct":22},"公司技术负责人",{"key":30,"text":425,"correct":22},"公司技术部门",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":30,"analysis":33},1166470,"对怀孕（ ）个月以上的女职工，不得安排其延长工作时间和夜班劳动。",[430,431,433,435],{"key":20,"text":329,"correct":22},{"key":24,"text":432,"correct":22},"5",{"key":27,"text":434,"correct":22},"8",{"key":30,"text":170,"correct":32},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},1166471,"对怀孕7个月以上的女职工，用人单位延长其劳动时间或者安排夜班劳动，由县级以上人民政府人力资源社会保障行政部门责令限期改正，按照受侵害女职工每人（ ）的标准计算，处以罚款。",[440,442,444,446],{"key":20,"text":441,"correct":22},"2000元以上5000元以下",{"key":24,"text":443,"correct":22},"3000元以上5000元以下",{"key":27,"text":445,"correct":32},"1000元以上5000元以下",{"key":30,"text":447,"correct":22},"1000元以上3000元以下",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},1166472,"休息日安排劳动者工作又不能安排补休的，支付不低于工资（ ）的工资报酬。",[452,454,456,458],{"key":20,"text":453,"correct":22},"100%",{"key":24,"text":455,"correct":22},"150%",{"key":27,"text":457,"correct":32},"200%",{"key":30,"text":459,"correct":22},"300%",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},1166473,"下列劳动争议调解委员会不能调解的劳动争议是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"开除争议",{"key":24,"text":467,"correct":22},"工资争议",{"key":27,"text":469,"correct":32},"保险争议",{"key":30,"text":471,"correct":22},"集体劳动合同争议",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},1166474,"（ ）应当组织有关部门制定甲县行政区域内特大生产安全事故应急救援预案，建立应急救援体系。",[476,478,480,482],{"key":20,"text":477,"correct":22},"甲县劳动局",{"key":24,"text":479,"correct":22},"甲县安监局",{"key":27,"text":481,"correct":32},"甲县人民政府",{"key":30,"text":483,"correct":22},"甲县公安局",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1166475,"根据我国《劳动合同法》的规定，用人单位安排加班不支付加班费的，由劳动行政部门责令限期支付；逾期不支付的，由劳动行政部门责令用人单位按应付金额（ ）的标准向劳动者加付赔偿金。",[488,490,492,494],{"key":20,"text":489,"correct":32},"百分之五十以上百分之一百以下",{"key":24,"text":491,"correct":22},"百分之五十",{"key":27,"text":493,"correct":22},"百分之一百",{"key":30,"text":495,"correct":22},"百分之一百以下",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":30,"analysis":33},1166476,"用人单位制定的劳动规章制度违反法律、法规规定的，由劳动行政部门进行处罚，下列不正确的是（ ）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"给予警告",{"key":24,"text":503,"correct":22},"责令改正",{"key":27,"text":505,"correct":22},"责令赔偿",{"key":30,"text":507,"correct":32},"行政处罚",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1166477,"当劳动者一方当事人在（ ）人以上，且有共同理由的劳动争议，称为集体劳动争议。",[512,513,514,516],{"key":20,"text":327,"correct":22},{"key":24,"text":329,"correct":32},{"key":27,"text":515,"correct":22},"4",{"key":30,"text":432,"correct":22},{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":30,"analysis":33},1166478,"《劳动者权益保护法》对法定休假日工作的工资支付应不低于平时工资的（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"150％",{"key":24,"text":524,"correct":22},"200％",{"key":27,"text":526,"correct":22},"250％",{"key":30,"text":528,"correct":32},"300％",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1166479,"某矿山企业的如下工作安排中，不违反《劳动法》中关于劳动保护规定的是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":32},"安排怀孕4个月的李某夜班看护仪表",{"key":24,"text":536,"correct":22},"未对未成年工进行定期健康检查",{"key":27,"text":538,"correct":22},"安排女职工王某从事井下作业",{"key":30,"text":540,"correct":22},"安排未成年工进行井下作业",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":30,"analysis":33},1166480,"劳动争议在起诉前必须经过（ ）程序，不能直接向人民法院起诉。",[545,547,549,551],{"key":20,"text":546,"correct":22},"协商",{"key":24,"text":548,"correct":22},"调解",{"key":27,"text":550,"correct":22},"调查",{"key":30,"text":552,"correct":32},"仲裁",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},1166481,"施工单位生产工人的劳动保护费属于（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":32},"直接工程的人工费",{"key":24,"text":560,"correct":22},"措施费",{"key":27,"text":562,"correct":22},"企业管理费中的保险费",{"key":30,"text":564,"correct":22},"社会保险费",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},1166482,"从事噪声作业应佩戴什么防护用品？（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"工作服",{"key":24,"text":572,"correct":22},"安全帽",{"key":27,"text":574,"correct":32},"耳塞或耳罩",{"key":30,"text":576,"correct":22},"口罩",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},1166483,"下列不属于劳动争议仲裁委员会成员组成的是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"劳动行政部门代表",{"key":24,"text":584,"correct":32},"司法部门代表",{"key":27,"text":586,"correct":22},"工会代表",{"key":30,"text":588,"correct":22},"企业方面代表",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},1166484,"下列产生噪声污染中不属于机械噪声的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"纺织机",{"key":24,"text":596,"correct":32},"鼓风机",{"key":27,"text":598,"correct":22},"电锯",{"key":30,"text":600,"correct":22},"冲床",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":27,"analysis":33},1166485,"不属于全体劳动者休假的节日是（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"元旦",{"key":24,"text":608,"correct":22},"国际劳动节",{"key":27,"text":610,"correct":32},"妇女节",{"key":30,"text":612,"correct":22},"国庆节",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]