[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-829-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},829,"(劳务员)基础知识","建筑工程",0,3,50,1143,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,392,404,416,428,437,449,461,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1166386,1,"单选题","关于防水工程，下列说法不正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","水泥砂浆防水层通常称为刚性防水层，它依靠增加防水层厚度和提高砂浆层的密实性来达到防水要求",false,{"key":24,"text":25,"correct":22},"B","涂料防水层是用防水涂料涂刷于结构表面所形成的表面防水层，属于柔性防水层",{"key":27,"text":28,"correct":29},"C","为了有效地保护钢筋和阻止钢筋的引水作用，迎水面防水混凝土的钢筋保护层厚度，不得小于40mm",true,{"key":31,"text":32,"correct":22},"D","拆模后应及时进行填土，以避免混凝土因干缩和温差产生裂缝，也有利于混凝土后期强度的增长和抗渗性提高","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1166387,"按防水构造做法不同分类，有（ ）、附加防水层防水。",[38,40,42,44],{"key":20,"text":39,"correct":29},"结构构件自防水",{"key":24,"text":41,"correct":22},"卷材防水",{"key":27,"text":43,"correct":22},"涂膜防水",{"key":31,"text":45,"correct":22},"细石混凝土防水",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1166388,"砖砌体中，标准砖的丁面尺寸为（ ）mm。",[50,52,54,56],{"key":20,"text":51,"correct":29},"115×53",{"key":24,"text":53,"correct":22},"240×53",{"key":27,"text":55,"correct":22},"240×115",{"key":31,"text":57,"correct":22},"190×90",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1166389,"对于主要用锹、锄头挖掘，少许用镐翻松的土，此类土可以判断为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"一类土（松软土）",{"key":24,"text":65,"correct":29},"二类土（普通土）",{"key":27,"text":67,"correct":22},"三类土（坚土）",{"key":31,"text":69,"correct":22},"四类土（砂砾坚土）",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1166390,"防水混凝土的自然养护时间不少于（ ）天。",[74,76,78,80],{"key":20,"text":75,"correct":22},"2",{"key":24,"text":77,"correct":22},"7",{"key":27,"text":79,"correct":22},"12",{"key":31,"text":81,"correct":29},"14",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1166391,"对墙和柱模板的要求，主要是保证其垂直度以及（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"支承新浇混凝土的竖向压力",{"key":24,"text":89,"correct":29},"抵抗新浇筑混凝土的侧压力",{"key":27,"text":91,"correct":22},"方便作业人员浇筑混凝土",{"key":31,"text":93,"correct":22},"方便作业人员进行安装钢筋",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1166392,"下列关于基坑支护的表述中，错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"钢板桩支护具有施工速度快，可重复使用的特点",{"key":24,"text":101,"correct":22},"工程开挖土方时，地下连续墙可用作支护结构，既挡土又挡水，地下连续墙还可同时用作建筑物的承重结构",{"key":27,"text":103,"correct":22},"深层搅拌水泥土桩墙，采用水泥作为固化剂",{"key":31,"text":105,"correct":29},"常用的钢板桩施工机械有自由落锤、气动锤、柴油锤、振动锤，使用较多的是柴油锤",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1166393,"底板混凝土应连续浇灌，不得留施工缝。墙体一般只允许留水平施工缝，其位置一般宜留在高出底板上表面不小于（ ）mm的墙身上。",[110,112,114,116],{"key":20,"text":111,"correct":22},"200",{"key":24,"text":113,"correct":22},"300",{"key":27,"text":115,"correct":22},"400",{"key":31,"text":117,"correct":29},"500",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1166394,"土方的边坡坡度一般以（ ）表示，它影响到土方开挖边坡的稳定性。",[122,124,126,128],{"key":20,"text":123,"correct":22},"坡底宽度（h）与挖方深度（h）之比",{"key":24,"text":125,"correct":29},"挖方深度（h）与坡底宽度（b）之比",{"key":27,"text":127,"correct":22},"边坡系数（m）与坡底宽度（b）之比",{"key":31,"text":129,"correct":22},"边坡系数（m）与挖方深度（h）之比",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1166395,"下列关于卷材防水施工的说法中，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"铺设防水卷材前应涂刷基层处理剂，基层处理剂应采用与卷材性能配套（相容）的材料，或采用同类涂料的底子油",{"key":24,"text":137,"correct":22},"铺贴高分子防水卷材时，切忌拉伸过紧，以免使卷材长期处在受拉应力状态，易加速卷材老化",{"key":27,"text":139,"correct":22},"施工工艺流程为：找平层施工→防水层施工→保护层施工→质量检查",{"key":31,"text":141,"correct":29},"卷材搭接接缝口应采用宽度不小于20mm的密封材料封严，以确保防水层的整体防水性能",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1166396,"对于HPB300级钢筋作为受力钢筋时，其末端应做（ ）弯钩。",[146,148,150,152],{"key":20,"text":147,"correct":22},"45°",{"key":24,"text":149,"correct":22},"90°",{"key":27,"text":151,"correct":22},"135°",{"key":31,"text":153,"correct":29},"180°",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1166397,"下列关于涂料防水施工工艺的说法中，错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"防水涂料防水层属于柔性防水层",{"key":24,"text":161,"correct":22},"一般采用外防外涂和外防内涂施工方法",{"key":27,"text":163,"correct":29},"其施工工艺流程为：找平层施工→保护层施工→防水层施工→质量检查",{"key":31,"text":165,"correct":22},"找平层有水泥砂浆找平层、沥青砂浆找平层、细石混凝土找平层三种",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1166398,"墙钢筋绑扎采用双层钢筋网时，撑铁长度等于两层网片的净距，间距约为（ ）m，相互错开排列。",[170,172,174,176],{"key":20,"text":171,"correct":22},"0.5",{"key":24,"text":173,"correct":29},"1",{"key":27,"text":175,"correct":22},"1.5",{"key":31,"text":75,"correct":22},{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1166399,"建筑工程上使用的防水卷材，其性能主要有（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"弯折强度、延伸率、在温度变化下的稳定性、抗老化等性",{"key":24,"text":184,"correct":22},"拉伸强度、延伸率、在温度变化下的软化性、抗老化等性",{"key":27,"text":186,"correct":29},"拉伸强度、延伸率、在温度变化下的稳定性、抗老化等性",{"key":31,"text":188,"correct":22},"断裂强度、拉伸长度、在温度变化下的稳定性、抗老化等性",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1166400,"下列焊接方法中，不属于钢结构工程常用的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"自动（半自动）埋弧焊",{"key":24,"text":196,"correct":29},"闪光对焊",{"key":27,"text":198,"correct":22},"药皮焊条手工电弧焊",{"key":31,"text":200,"correct":22},"气体保护焊",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1166401,"最常用的砂浆的强度等级为（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"M0.5和M1.0",{"key":24,"text":208,"correct":22},"M2.5和M5",{"key":27,"text":210,"correct":22},"M3.5和M5.0",{"key":31,"text":212,"correct":29},"M5和M7.5",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1166402,"在填方工程中，以下说法正确的是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"必须采用同类土填筑",{"key":24,"text":220,"correct":22},"当天填土，应隔天压实",{"key":27,"text":222,"correct":29},"应由下至上分层铺填",{"key":31,"text":224,"correct":22},"基础墙两侧不宜同时填筑",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1166403,"某多层现浇混凝土框架结构办公楼工程，位于7度抗震设防地区，共5层，层高3.3m，坡屋顶。基础为柱下钢筋混凝土独立基础，墙下条形基础，基础墙采用MU15的混凝土砖砌筑，上部墙体采用MlJ7.5混凝土空心砖砌筑，所用的砂浆有M10的水泥砂浆和M5混合砂浆。砌筑时外部采用扣件式钢管脚手架，里面采用角钢折叠式里脚手架。基础和上部结构均采用C30混凝土，屋面为钢筋混凝土现浇坡屋面。整个工程历时300d完成，施工良好，无安全事故发生。 本工程中梁支座处上部钢筋连接优先采用（ ）的连接方式。",[229,231,233,235],{"key":20,"text":230,"correct":22},"绑扎搭接",{"key":24,"text":232,"correct":29},"机械连接",{"key":27,"text":234,"correct":22},"埋弧焊接",{"key":31,"text":236,"correct":22},"电阻点焊",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1166404,"钢结构的连接方法不包括（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":29},"绑扎连接",{"key":24,"text":244,"correct":22},"焊接",{"key":27,"text":246,"correct":22},"螺栓连接",{"key":31,"text":248,"correct":22},"铆钉连接",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1166405,"下列关于砌块砌体施工工艺的基本规定中，不正确的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"灰缝厚度宜为15mm",{"key":24,"text":256,"correct":22},"灰缝要求横平竖直，水平灰缝应饱满，竖缝采用挤浆和加浆方法，严禁用水冲洗清理灌缝",{"key":27,"text":258,"correct":22},"在墙体底部，在砌第一皮加气砖前，应用实心砖砌筑，其高度宜不小于200mm",{"key":31,"text":260,"correct":29},"与梁的接触处待加气砖砌完14d后采用灰砂砖斜砌顶紧",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},1166406,"下列各项中，关于混凝土拌合料运输过程中一般要求不正确的说法是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"保持其均匀性，不离析、不漏浆",{"key":24,"text":268,"correct":22},"保证混凝土浇筑能连续进行",{"key":27,"text":270,"correct":22},"运到浇筑地点时应具有设计配合比所规定的坍落度",{"key":31,"text":272,"correct":29},"应在混凝土终凝前浇入模板并捣实完毕",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},1166407,"混凝土浇水养护的时间：对采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的混凝土，不得少于（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":29},"7d",{"key":24,"text":280,"correct":22},"10d",{"key":27,"text":282,"correct":22},"5d",{"key":31,"text":284,"correct":22},"14d",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},1166408,"下列关于涂料防水中防水层施工的说法中，正确的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"湿铺法是在铺第三遍涂料涂刷时，边倒料、边涂刷、便铺贴的操作方法",{"key":24,"text":292,"correct":29},"对于流动性差的涂料，为便于抹压，加快施工进度，可以采用分条间隔施工的方法，条带宽800～1000mm",{"key":27,"text":294,"correct":22},"胎体增强材料混合使用时，一般下层采用玻璃纤维布，上层采用聚酯纤维布",{"key":31,"text":296,"correct":22},"所有收头均应用密封材料压边，压扁宽度不得小于20mm",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1166409,"下列土的工程分类，除（ ）之外，均为岩石。",[301,303,305,307],{"key":20,"text":302,"correct":22},"软石",{"key":24,"text":304,"correct":29},"砂砾坚土",{"key":27,"text":306,"correct":22},"坚石",{"key":31,"text":308,"correct":22},"特坚石",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},1166410,"下列各项中，不属于混凝土工程施工内容的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"混凝土拌合料的制备",{"key":24,"text":316,"correct":22},"混凝土拌合料的养护",{"key":27,"text":318,"correct":29},"混凝土拌合料的强度测定",{"key":31,"text":320,"correct":22},"混凝土拌合料的振捣",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1166411,"下列按砌筑主体不同分类的砌体工程中，不符合的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"砖砌体工程",{"key":24,"text":328,"correct":22},"砌块砌体工程",{"key":27,"text":330,"correct":22},"石砌体工程",{"key":31,"text":332,"correct":29},"混凝土砌体工程",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":20,"analysis":33},1166412,"影响填土压实的因素除了机械压实功和每层铺土厚度，还有（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":29},"土的含水量",{"key":24,"text":340,"correct":22},"土的渗透性",{"key":27,"text":342,"correct":22},"土的可松性",{"key":31,"text":344,"correct":22},"土的压实系数",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1166413,"刚性多层抹面水泥砂浆防水层是利用不同（ ）的水泥浆和水泥砂浆分层分次抹压施工而成的防水层。",[349,351,353,355],{"key":20,"text":350,"correct":29},"配合比",{"key":24,"text":352,"correct":22},"抗压强度",{"key":27,"text":354,"correct":22},"水泥品种",{"key":31,"text":356,"correct":22},"颗粒粒径",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},1166414,"施工项目成本控制的措施是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":29},"组织措施、技术措施、经济措施",{"key":24,"text":364,"correct":22},"控制人工费用、控制材料费、控制机械费用、控制间接费及其他直接费",{"key":27,"text":366,"correct":22},"组织措施、制度措施、管理措施",{"key":31,"text":368,"correct":22},"管理措施、技术措施、人力措施",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},1166415,"下列措施中，不属于施工准备阶段的安全技术措施的是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"技术准备",{"key":24,"text":376,"correct":22},"物资准备",{"key":27,"text":378,"correct":29},"资金准备",{"key":31,"text":380,"correct":22},"施工队伍准备",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1166416,"施工现场四周应进行封闭围护，如市区主要道路的围护设施高度应不低于（ ）。",[385,387,388,390],{"key":20,"text":386,"correct":29},"1.8",{"key":24,"text":75,"correct":22},{"key":27,"text":389,"correct":22},"2.5",{"key":31,"text":391,"correct":22},"3",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":27,"analysis":33},1166417,"材料出厂或进场验收，主要包括验收准备、（ ）和数量验收等。",[396,398,400,402],{"key":20,"text":397,"correct":22},"外包装",{"key":24,"text":399,"correct":22},"材料品种",{"key":27,"text":401,"correct":29},"质量验收",{"key":31,"text":403,"correct":22},"使用说明",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},1166418,"下列性质中，不属于项目经理部的性质的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":29},"法律强制性",{"key":24,"text":411,"correct":22},"相对独立性",{"key":27,"text":413,"correct":22},"综合性",{"key":31,"text":415,"correct":22},"临时性",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},1166419,"施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"进度控制",{"key":24,"text":423,"correct":29},"安全控制",{"key":27,"text":425,"correct":22},"质量控制",{"key":31,"text":427,"correct":22},"成本控制",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1166420,"以下不属于项目经理部的性质的是（ ）。",[432,433,434,435],{"key":20,"text":411,"correct":22},{"key":24,"text":413,"correct":22},{"key":27,"text":415,"correct":22},{"key":31,"text":436,"correct":29},"监督性",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1166421,"以下不属于施工项目现场管理内容的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"建立施工现场管理组织",{"key":24,"text":444,"correct":22},"建立文明施工现场",{"key":27,"text":446,"correct":22},"及时清场转移",{"key":31,"text":448,"correct":29},"根据施工工程任务需要及时调整项目经理部",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":20,"analysis":33},1166422,"施工项目资源管理的全过程包括（ ）环节。",[453,455,457,459],{"key":20,"text":454,"correct":29},"编制计划、配置、控制、处置",{"key":24,"text":456,"correct":22},"编制目标、计划、控制、处理",{"key":27,"text":458,"correct":22},"编制计划、采购、应用、处置",{"key":31,"text":460,"correct":22},"编制目标、计划、采购、检查",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1166423,"建设工程三级安全教育包括进人公司、进人（ ）、进人班组。",[465,467,469,471],{"key":20,"text":466,"correct":22},"总包单位",{"key":24,"text":468,"correct":22},"分包单位",{"key":27,"text":470,"correct":22},"建设单位",{"key":31,"text":472,"correct":29},"项目部",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1166424,"工程质量不符合要求时，应按规定进行处理，下列选项（ ）不符合规定。",[477,479,481,483],{"key":20,"text":478,"correct":29},"经返修或加固处理仍不能满足安全的分部工程及单位工程，可以降级验收",{"key":24,"text":480,"correct":22},"经有资质的检测机构检测鉴定能够达到设计要求的检验批，应予以验收",{"key":27,"text":482,"correct":22},"经有资质的检测机构检测鉴定达不到设计要求，但经原设计单位核算认可能够满足安全检验批，可予以验收",{"key":31,"text":484,"correct":22},"经返修和加固处理的分项分部工程，满足安全及使用功能要求时，可按技术处理方案和协商文件的要求予以验收",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1166425,"以下关于施工项目目标控制的表述，错误的是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"施工项目目标控制问题的要素包括施工项目、控制目标、控制主体、实施计划、实施信息、偏差数据、纠偏措施、纠偏行为",{"key":24,"text":492,"correct":22},"施工项目控制的目的是排除干扰、实现合同目标",{"key":27,"text":494,"correct":22},"施工项目目标控制是实现施工目标的手段",{"key":31,"text":496,"correct":29},"施工项目目标控制包括进度控制、质量控制和成本控制三个方面",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},1166426,"下列关于施工项目管理组织的形式的说法中，错误的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"工作队式项目组织适用于大型项目，工期要求紧，要求多工种、多部门配合的项目",{"key":24,"text":504,"correct":22},"事业部式适用于大型经营型企业的工程承包",{"key":27,"text":506,"correct":29},"部门控制式项目组织一般适用于专业性强的大中型项目",{"key":31,"text":508,"correct":22},"矩阵制项目组织适用于同时承担多个需要进行项目管理工程的企业",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},1166427,"施工现场主人口处应有安全纪律牌，它包括（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"安全警告标志、安全生产和劳动纪律制度",{"key":24,"text":516,"correct":29},"安全警示标志、安全生产及消防保卫制度",{"key":27,"text":518,"correct":22},"安全教育图片、安全生产和门卫保卫制度",{"key":31,"text":520,"correct":22},"安全教育图片、安全生产和消防保卫制度",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1166428,"选聘称职的项目经理，组建项目经理部，明确责任、义务和权限，是施工项目管理内容中的（ ）的内容之一。",[525,527,529,531],{"key":20,"text":526,"correct":22},"施工项目目标控制",{"key":24,"text":528,"correct":29},"建立施工项目管理组织",{"key":27,"text":530,"correct":22},"降低施工成本",{"key":31,"text":532,"correct":22},"保证项目目标的实现",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},1166429,"对人力资源优化配置时，应以（ ）为原则。",[537,539,541,543],{"key":20,"text":538,"correct":22},"成本优先、双向选择、优胜劣汰、竞争择优",{"key":24,"text":540,"correct":22},"精干高效、考核选择、优胜劣汰、择优录用",{"key":27,"text":542,"correct":22},"成本优先、双向选择、治懒劣汰、择优录用",{"key":31,"text":544,"correct":29},"精干高效、双向选择、治懒劣汰、竞争择优",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1166430,"工人甲在某工程上剔凿保护层上的裂缝，由于没有将剔凿所用的工具带到工作面，便回去取工具，行走途中不小心踏上了通道口盖板（通道口尺寸1.3mx1.3m，盖板为104mx1.4m、厚度1mm的镀锌铁皮），铁皮在甲的踩踏下，迅速变形塌落，甲随塌落的盖板掉到首层地面（落差12.35m），经抢救无效于当日死亡。这是一起由于“四口\"防护不到位所引起的伤亡事故。 安全防护的“四口”是指楼梯口、电梯井口、通道口及（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"通风口",{"key":24,"text":552,"correct":29},"预留洞口",{"key":27,"text":554,"correct":22},"门窗洞口",{"key":31,"text":556,"correct":22},"下水道口",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1166431,"施工项目过程控制中，加强专项检查，包括自检、（ ）、互检。",[561,563,565,567],{"key":20,"text":562,"correct":29},"专检",{"key":24,"text":564,"correct":22},"全检",{"key":27,"text":566,"correct":22},"交接检",{"key":31,"text":568,"correct":22},"质检",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},1166432,"施工项目的生产要素主要包括（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"人员、原材料、设备、技术和资金",{"key":24,"text":576,"correct":22},"人员、原材料、机器、技术和成本",{"key":27,"text":578,"correct":29},"劳动力、材料、设备、技术和资金",{"key":31,"text":580,"correct":22},"劳动力、材料、机器、技术和成本",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":31,"analysis":33},1166433,"以下关于施工项目经理部综合性的描述，错误的是（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"施工项目经理部是企业所属的经济组织，主要职责是管理施工项目的各种经济活动",{"key":24,"text":588,"correct":22},"施工项目经理部的管理职能是综合的，包括计划、组织、控制、协调、指挥等多方面",{"key":27,"text":590,"correct":22},"施工项目经理部的管理业务是综合的，从横向看包括人、财、物、生产和经营活动，从纵向看包括施工项目寿命周期的主要过程",{"key":31,"text":592,"correct":29},"施工项目经理部受企业多个职能部门的领导",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},1166434,"下列不属于施工项目管理特征的选项是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":29},"施工项目的管理者是建设单位",{"key":24,"text":600,"correct":22},"施工项目管理的对象是施工项目",{"key":27,"text":602,"correct":22},"施工项目管理的内容是按阶段变化的",{"key":31,"text":604,"correct":22},"施工项目管理要求强化组织协调工作",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":24,"analysis":33},1166435,"项目经理部解体后，其工程结算、价款回收及加工订货等债权债务的处理，由（ ）完成。",[609,611,613,615],{"key":20,"text":610,"correct":22},"项目经理",{"key":24,"text":612,"correct":29},"留守小组",{"key":27,"text":614,"correct":22},"公司法人",{"key":31,"text":616,"correct":22},"公司财务部门",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]