[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-829-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":742},{"id":5,"name":6,"category":7,"favorite":8},829,"(劳务员)基础知识","建筑工程",0,13,50,1143,[13,38,53,68,83,98,113,128,143,157,172,186,200,214,228,242,257,272,287,301,316,330,344,358,373,387,401,415,429,443,458,472,487,501,516,531,545,559,573,588,602,616,630,644,658,672,686,700,714,728],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1166887,2,"多选题","砖的种类很多，可按材料、制作工艺分，又可按有无穿孔分，属于按材料分的砖有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","黏土砖",true,{"key":24,"text":25,"correct":22},"B","页岩砖",{"key":27,"text":28,"correct":22},"C","灰砂砖",{"key":30,"text":31,"correct":32},"D","烧结砖",false,{"key":34,"text":35,"correct":22},"E","炉渣砖","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1166888,"砂浆按其用途可分为（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"砌筑砂浆",{"key":24,"text":45,"correct":22},"抹面砂浆",{"key":27,"text":47,"correct":22},"防水砂浆",{"key":30,"text":49,"correct":22},"装饰砂浆",{"key":34,"text":51,"correct":32},"建筑砂浆","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1166889,"下列关于通用水泥的特性及应用的基本规定中，表述正确的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"复合硅酸盐水泥适用于早期强度要求高的工程及冬期施工的工程",{"key":24,"text":60,"correct":22},"矿渣硅酸盐水泥适用于大体积混凝土工程",{"key":27,"text":62,"correct":32},"粉煤灰硅酸盐水泥适用于有抗渗要求的工程",{"key":30,"text":64,"correct":32},"火山灰质硅酸盐水泥适用于抗裂性要求较高的构件",{"key":34,"text":66,"correct":22},"硅酸盐水泥适用于严寒地区遭受反复冻融循环作用的混凝土工程","BE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1166890,"下列有关建筑平面图的图示内容的表述中，不正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"定位轴线的编号宜标注在图样的下方与右侧，横向编号应用阿拉伯数字，从左至右顺序编写，竖向编号应用大写拉丁字母，从上至下顺序编写",{"key":24,"text":75,"correct":32},"对于隐蔽的或者在剖切面以上部位的内容，应以虚线表示",{"key":27,"text":77,"correct":32},"建筑平面图上的外部尺寸在水平方向和竖直方向各标注三道尺寸",{"key":30,"text":79,"correct":22},"在平面图上所标注的标高均应为绝对标高",{"key":34,"text":81,"correct":32},"屋面平面图一般内容有：女儿墙、檐沟、屋面坡度、分水线与落水口、变形缝、楼梯间、水箱间、天窗、上人孔、消防梯以及其他构筑物、索引符号等","AD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1166891,"楼梯建筑详图包括有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"平面图",{"key":24,"text":90,"correct":22},"剖面图",{"key":27,"text":92,"correct":32},"梯段配筋图",{"key":30,"text":94,"correct":32},"平台配筋图",{"key":34,"text":96,"correct":22},"节点详图","ABE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1166892,"建筑立面图的命名方式有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"用朝向命名",{"key":24,"text":105,"correct":22},"用外貌特征命名",{"key":27,"text":107,"correct":22},"用首尾轴线命名",{"key":30,"text":109,"correct":32},"用所处地势命名",{"key":34,"text":111,"correct":32},"用平面位置命名","ABC",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1166893,"房屋建筑工程图由（ ）几个专业工种的施工图组成。",[117,119,121,123,125],{"key":20,"text":118,"correct":32},"总平面图",{"key":24,"text":120,"correct":22},"建筑施工图",{"key":27,"text":122,"correct":22},"结构施工图",{"key":30,"text":124,"correct":32},"基础施工图",{"key":34,"text":126,"correct":22},"设备施工图","BCE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1166894,"下列关于建筑详图基本规定的说法中，正确的是（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":32},"内外墙节点一般用平面图、立面图和剖面图表示",{"key":24,"text":135,"correct":22},"楼梯平面图必须分层绘制，一般有底层平面图，标准层平面图和顶层平面图",{"key":27,"text":137,"correct":32},"楼梯详图一般包括楼梯平面图、楼梯立面图、楼梯剖面图和节点详图",{"key":30,"text":139,"correct":22},"楼梯间剖面图只需绘制出与楼梯相关的部分，相邻部分可用折断线断开",{"key":34,"text":141,"correct":22},"楼梯节点详图一般采用较大的比例绘制，如1:1、1:2、1:5、1:10、1:20等","BDE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":97,"analysis":37},1166895,"墙身详图要表明（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"墙脚的做法",{"key":24,"text":150,"correct":22},"梁、板等构件的位置",{"key":27,"text":152,"correct":32},"大梁的配筋",{"key":30,"text":154,"correct":32},"构件表面的装饰",{"key":34,"text":156,"correct":22},"墙身定位轴线",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1166896,"下列关于建筑制图的线型及其应用的说法中，正确的是（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"平、剖面图中被剖切的主要建筑构造（包括构配件）的轮廓线用粗实线绘制",{"key":24,"text":164,"correct":22},"建筑平、立、剖面图中的建筑构配件的轮廓线用中粗实线绘制",{"key":27,"text":166,"correct":32},"建筑立面图或室内立面图的外轮廓线用中粗实线绘制",{"key":30,"text":168,"correct":22},"拟建、扩建建筑物轮廓用中粗虚线绘制",{"key":34,"text":170,"correct":32},"预应力钢筋线在建筑结构中用粗单点长画线绘制","ABD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":171,"analysis":37},1166897,"建筑立面图的图示内容有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"室外地平线",{"key":24,"text":179,"correct":22},"房屋的勒脚、台阶",{"key":27,"text":181,"correct":32},"室内设备",{"key":30,"text":183,"correct":22},"阳台、雨篷等的标高",{"key":34,"text":185,"correct":32},"室内房间布局",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":36,"analysis":37},1166898,"建筑施工图简称“建施”的图样通常包括（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"首页和总平面图",{"key":24,"text":193,"correct":22},"建筑平面图",{"key":27,"text":195,"correct":22},"建筑立面图",{"key":30,"text":197,"correct":32},"基础平面图",{"key":34,"text":199,"correct":22},"建筑详图",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":36,"analysis":37},1166899,"在建筑工程图样上，尺寸的组成包括（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"尺寸界线",{"key":24,"text":207,"correct":22},"尺寸线",{"key":27,"text":209,"correct":22},"尺寸起止符号",{"key":30,"text":211,"correct":32},"尺寸大小",{"key":34,"text":213,"correct":22},"尺寸数字",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":112,"analysis":37},1166900,"防水工程按其按所用材料不同可分为（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"卷材防水",{"key":24,"text":221,"correct":22},"涂料防水",{"key":27,"text":223,"correct":22},"砂浆、混凝土防水",{"key":30,"text":225,"correct":32},"结构自防水",{"key":34,"text":227,"correct":32},"防水层防水",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":112,"analysis":37},1166901,"卷材粘贴按照卷材性能和施工方法，可以采用以下（ ）粘结方法。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"冷粘法",{"key":24,"text":235,"correct":22},"热熔法",{"key":27,"text":237,"correct":22},"自粘法",{"key":30,"text":239,"correct":32},"冷铺法",{"key":34,"text":241,"correct":32},"洒涂法",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1166902,"下列关于毛石砌体和砌块砌体施工工艺的基本规定中错误的是（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":32},"毛石墙砌筑时，墙角部分纵横宽度至少08m",{"key":24,"text":249,"correct":32},"对于中间毛石砌筑的料石挡土墙，丁砌料石应深入中间毛石部分的长度不应小于200mm",{"key":27,"text":251,"correct":22},"毛石墙必须设置拉结石，拉结石应均匀分布，相互错开，一般每05㎡墙面至少设置一块，且同皮内的中距不大于2m",{"key":30,"text":253,"correct":32},"砌块砌体施工工艺流程为：基层处理→测量墙中线→弹墙边线→砌底部实心砖→立皮数杆→拉准线、铺灰、依准线砌筑→埋墙拉筋→梁下、墙顶斜砖砌筑",{"key":34,"text":255,"correct":22},"砌块砌体的埋墙拉筋应与钢筋混凝土柱（墙）的连接，采取在混凝土柱（墙）上打入2φ6@1000的膨胀螺栓","CE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1166903,"混凝土浇筑采用机械振捣，其振捣的方法有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"内部振动器振捣",{"key":24,"text":264,"correct":32},"斜面振动器振捣",{"key":27,"text":266,"correct":22},"附着式振动器振捣",{"key":30,"text":268,"correct":22},"平板式振动器振捣",{"key":34,"text":270,"correct":32},"分层浇筑振捣","ACD",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1166904,"以下关于砖砌体的施工工艺的基本规定中，正确的是（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":32},"皮数杆一般立于房屋的四大角、内外墙交接处、楼梯间以及洞口多的洞口。一般可每隔5～10m立一根",{"key":24,"text":279,"correct":22},"一般在房屋外纵墙方向摆顺砖，在山墙方向摆丁砖，摆砖由一个大角摆到另一个大角，砖与砖留10mm缝隙",{"key":27,"text":281,"correct":22},"盘角时主要大角不宜超过5皮砖，且应随起随盘，做到“三皮一吊，五皮一靠”",{"key":30,"text":283,"correct":22},"各层标高除立皮数杆控制外，还可弹出室内水平线进行控制",{"key":34,"text":285,"correct":32},"加浆勾缝系指再砌筑几皮砖以后，先在灰缝处划出2Cm深的灰槽","BCD",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":112,"analysis":37},1166905,"常用的砖砌体砌砖方法有（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"铺灰挤砖法",{"key":24,"text":294,"correct":22},"三一砌砖法",{"key":27,"text":296,"correct":22},"坐灰砌砖法",{"key":30,"text":298,"correct":32},"梅花丁法",{"key":34,"text":300,"correct":32},"三顺一丁法",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":315,"analysis":37},1166906,"下列关于防水混凝土施工工艺的说法中，错误的是（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"水泥选用强度等级不低于32.5级",{"key":24,"text":308,"correct":32},"在保证能振捣密实的前提下水灰比尽可能小，一般不大于0.6，坍落度不大于50mm",{"key":27,"text":310,"correct":22},"为了有效起到保护钢筋和阻止钢筋的引水作用，迎水面防水混凝土的钢筋保护层厚度不得小于35mm",{"key":30,"text":312,"correct":32},"在浇筑过程中，应严格分层连续浇筑，每层厚度不宜超过300～400mm，机械振捣密实",{"key":34,"text":314,"correct":22},"墙体一般允许留水平施工缝和垂直施工缝","ACE",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":171,"analysis":37},1166907,"下列关于涂料防水中质量检查的说法中，正确的是（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":22},"找平层表面平整度的允许偏差为5mm",{"key":24,"text":323,"correct":22},"涂料防水层不得有渗漏或积水现象，其检验方法为：雨后或淋水、蓄水检验",{"key":27,"text":325,"correct":32},"防水涂料和胎体增强材料必须符合设计要求，检验方法为检查出厂合格证和质量检验报告",{"key":30,"text":327,"correct":22},"涂料防水层的平均厚度应符合设计要求，最小厚度不应小于设计厚度的80%",{"key":34,"text":329,"correct":32},"找平层分格缝的位置和间距应符合设计要求，其检验方法为观察检查",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":271,"analysis":37},1166908,"下列关于柱钢筋和板钢筋绑扎的施工工艺的规定中正确的是（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"柱钢筋绑扎中箍筋的接头应交错布置在四角纵向钢筋上，箍筋转角与纵向钢筋交叉点均应扎牢",{"key":24,"text":337,"correct":32},"板钢筋绑扎中板、次梁与主梁交叉处，板的钢筋在上，次梁的钢筋居中。主梁的钢筋一直在下侧",{"key":27,"text":339,"correct":22},"板钢筋绑扎的施工工艺流程为：清理垫层、划线→摆放下层钢筋，并固定绑扎→摆放钢筋撑脚（双层钢筋时）→安装管线→绑扎上层钢筋",{"key":30,"text":341,"correct":22},"对于双向受力板，应先铺设平行于短边方向的受力钢筋，后铺设平行于长边方向的受力钢筋",{"key":34,"text":343,"correct":32},"板上部的负筋、主筋与分布钢筋的交叉点应相隔交错扎牢，并垫上保护层垫块",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":97,"analysis":37},1166909,"下列关于钢结构安装施工要点的说法中，错误的是（ ）。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"起吊事先将钢构件吊离地面30Cm左右，使钢构件中心对准安装位置中心",{"key":24,"text":351,"correct":22},"高强度螺栓上、下接触面处加有1\u002F15以上斜度时应采用垫圈垫平",{"key":27,"text":353,"correct":32},"施焊前，焊工应检查焊接件的接头质量和焊接区域的坡口、间隙、钝边等的处理情况",{"key":30,"text":355,"correct":32},"厚度大于12～20mm的板材，单面焊后，背面清根，再进行焊接",{"key":34,"text":357,"correct":22},"焊道两端加引弧板和熄弧板，引弧和熄弧焊缝长度应大于或等于150mm",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":372,"analysis":37},1166910,"下列关于土方回填压实的基本规定的各项中，正确的是（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":32},"碎石类土、砂土和爆破石渣（粒径不大于每层铺土后2\u002F3）可作各层填料",{"key":24,"text":365,"correct":32},"人工填土每层虚铺厚度，用人工木夯夯实时不大于25Cm，用打夯机械夯实时不大于30Cm",{"key":27,"text":367,"correct":22},"铺土应分层进行，每次铺土厚度不大于30～50Cm（视所用压实机械的要求而定）",{"key":30,"text":369,"correct":22},"当填方基底为耕植土或松土时，应将基底充分夯实和碾压密实",{"key":34,"text":371,"correct":22},"机械填土时填土程序一般尽量采取横向或纵向分层卸土，以利行驶时初步压实","CDE",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":97,"analysis":37},1166911,"关于混凝土浇筑的说法中正确的是（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"混凝土的浇筑工作应连续进行",{"key":24,"text":380,"correct":22},"混凝土应分层浇筑，分层捣实，但两层混凝土浇捣时间间隔不超过规范规定",{"key":27,"text":382,"correct":32},"在竖向结构中如浇筑高度超过2m时，应采用溜槽或串筒下料",{"key":30,"text":384,"correct":32},"浇筑竖向结构混凝土前，应先在底部填筑一层20～50mm厚、与混凝土内砂浆成分相同的水泥砂浆，然后再浇筑混凝土",{"key":34,"text":386,"correct":22},"浇筑过程应经常观察模板及其支架、钢筋、埋设件和预留孔洞的情况，当发现有变形或位移时，应立即快速处理",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":286,"analysis":37},1166912,"起重机型号选择取决于下述（ ）工作参数，工作参数均应满足结构安装的要求。",[391,393,395,397,399],{"key":20,"text":392,"correct":32},"行走距离",{"key":24,"text":394,"correct":22},"起重高度",{"key":27,"text":396,"correct":22},"起重半径",{"key":30,"text":398,"correct":22},"起重量",{"key":34,"text":400,"correct":32},"爬坡高度",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":36,"analysis":37},1166913,"下列各项中，属于钢筋加工的是（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"钢筋除锈",{"key":24,"text":408,"correct":22},"钢筋调直",{"key":27,"text":410,"correct":22},"钢筋切断",{"key":30,"text":412,"correct":32},"钢筋冷拉",{"key":34,"text":414,"correct":22},"钢筋弯曲成型",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":67,"analysis":37},1166914,"以下关于混凝土空心砖砌体的施工工艺的基本规定中，不正确的是（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":32},"砌体水平灰缝厚度一般为14mm",{"key":24,"text":422,"correct":22},"将搅拌好的砂浆，通过吊斗、灰车运至砌筑地点，在砌块就位前，用大铲、灰勺进行分块铺灰，但铺灰长度不得超过1200mm",{"key":27,"text":424,"correct":32},"底部先用实心块砌筑，高度不低于200mm",{"key":30,"text":426,"correct":32},"砖块排列时尽可能采用主规格的砖块，主规格的砖砌块应占总量的75%～80%",{"key":34,"text":428,"correct":22},"每砌一皮砖，就位校正后，用砂浆灌垂直缝，随后进行灰缝的勒缝（原浆勾缝），深度一般为5～8mm",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":36,"analysis":37},1166915,"用于振捣密实混凝土拌合物的机械，按其作业方式可分为（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"插入式振动器",{"key":24,"text":436,"correct":22},"表面振动器",{"key":27,"text":438,"correct":22},"振动台",{"key":30,"text":440,"correct":32},"独立式振动器",{"key":34,"text":442,"correct":22},"附着式振动器",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":457,"analysis":37},1166916,"某多层现浇混凝土框架结构办公楼工程，位于7度抗震设防地区，共5层，层高3.3m，坡屋顶。基础为柱下钢筋混凝土独立基础，墙下条形基础，基础墙采用MU15的混凝土砖砌筑，上部墙体采用MlJ7.5混凝土空心砖砌筑，所用的砂浆有M10的水泥砂浆和M5混合砂浆。砌筑时外部采用扣件式钢管脚手架，里面采用角钢折叠式里脚手架。基础和上部结构均采用C30混凝土，屋面为钢筋混凝土现浇坡屋面。整个工程历时300d完成，施工良好，无安全事故发生。 本工程中模板按照使用部位可以分成（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"梁模板",{"key":24,"text":450,"correct":22},"柱模板",{"key":27,"text":452,"correct":32},"墙模板",{"key":30,"text":454,"correct":22},"楼梯模板",{"key":34,"text":456,"correct":22},"板模板","ABDE",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":271,"analysis":37},1166917,"工人甲在某工程上剔凿保护层上的裂缝，由于没有将剔凿所用的工具带到工作面，便回去取工具，行走途中不小心踏上了通道口盖板（通道口尺寸1.3mx1.3m，盖板为104mx1.4m、厚度1mm的镀锌铁皮），铁皮在甲的踩踏下，迅速变形塌落，甲随塌落的盖板掉到首层地面（落差12.35m），经抢救无效于当日死亡。这是一起由于“四口\"防护不到位所引起的伤亡事故。 为了防止出现高处坠落危险，必须正确使用“三宝”，其包括（ ）。（多项选择题）",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"安全帽",{"key":24,"text":465,"correct":32},"防护镜",{"key":27,"text":467,"correct":22},"安全带",{"key":30,"text":469,"correct":22},"安全网",{"key":34,"text":471,"correct":32},"安全鞋",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":486,"analysis":37},1166918,"施工项目主要的管理组织形式有（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":32},"工程队式",{"key":24,"text":479,"correct":22},"工作队式",{"key":27,"text":481,"correct":22},"部门控制式",{"key":30,"text":483,"correct":22},"矩阵式",{"key":34,"text":485,"correct":22},"事业部式","BCDE",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":112,"analysis":37},1166919,"施工准备阶段的安全技术措施包括（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"技术准备",{"key":24,"text":494,"correct":22},"物质准备",{"key":27,"text":496,"correct":22},"施工现场准备",{"key":30,"text":498,"correct":32},"施工班组准备",{"key":34,"text":500,"correct":32},"安全措施准备",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":515,"analysis":37},1166920,"下列各项中，不属于施工项目管理的内容的是（ ）。",[505,507,509,511,513],{"key":20,"text":506,"correct":32},"建立施工项目管理组织",{"key":24,"text":508,"correct":22},"编制《施工项目管理目标责任书》",{"key":27,"text":510,"correct":32},"施工项目的生产要素管理",{"key":30,"text":512,"correct":22},"施工项目的施工情况的评估",{"key":34,"text":514,"correct":32},"施工项目的信息管理","BD",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":530,"analysis":37},1166921,"项目经理部物资设备供应部门的主要工作有（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":32},"劳动管理",{"key":24,"text":523,"correct":32},"工程预结算",{"key":27,"text":525,"correct":32},"资金收支",{"key":30,"text":527,"correct":22},"材料的询价",{"key":34,"text":529,"correct":22},"机械设备的租赁配套使用","DE",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":52,"analysis":37},1166922,"以下属于施工项目资源管理的内容的是（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"劳动力",{"key":24,"text":538,"correct":22},"材料",{"key":27,"text":540,"correct":22},"技术",{"key":30,"text":542,"correct":22},"机械设备",{"key":34,"text":544,"correct":32},"施工现场",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":315,"analysis":37},1166923,"施工项目应从以下方面进行组织和管理（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"劳动力组织",{"key":24,"text":552,"correct":32},"劳务班组组织",{"key":27,"text":554,"correct":22},"劳务输入",{"key":30,"text":556,"correct":32},"劳务输出",{"key":34,"text":558,"correct":22},"项目经理部对劳务队伍的管理",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":52,"analysis":37},1166924,"施工项目资源的分配计划包括（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"人员需求分配计划",{"key":24,"text":566,"correct":22},"物资需求分配计划",{"key":27,"text":568,"correct":22},"设备和设施需求分配计划",{"key":30,"text":570,"correct":22},"资金需求分配计划",{"key":34,"text":572,"correct":32},"安全防护需求分配计划",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":587,"analysis":37},1166925,"施工项目管理的目标应符合合同的要求，其主要内容包括（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"施工的质量目标",{"key":24,"text":580,"correct":32},"施工的利润目标",{"key":27,"text":582,"correct":22},"施工的进度目标",{"key":30,"text":584,"correct":22},"施工的安全管理目标",{"key":34,"text":586,"correct":22},"文明施工和环境保护目标","ACDE",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":587,"analysis":37},1166926,"施工项目管理具有（ ）特点。",[592,594,596,598,600],{"key":20,"text":593,"correct":22},"施工项目管理的主体是建筑企业",{"key":24,"text":595,"correct":32},"施工项目管理的主体是建设单位",{"key":27,"text":597,"correct":22},"施工项目管理的对象是施工项目",{"key":30,"text":599,"correct":22},"施工项目管理的内容是按阶段变化的",{"key":34,"text":601,"correct":22},"施工项目管理要求强化组织协调工作",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":52,"analysis":37},1166927,"施工现场管理标准化包括（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"现场布置标准化",{"key":24,"text":609,"correct":22},"工序作业标准化",{"key":27,"text":611,"correct":22},"生活办公区管理标准化",{"key":30,"text":613,"correct":22},"现场分区责任标准化",{"key":34,"text":615,"correct":32},"办公设施标准化",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":457,"analysis":37},1166928,"下列属于项目经理部的主要管理制度的是（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"项目技术管理制度",{"key":24,"text":623,"correct":22},"项目质量管理制度",{"key":27,"text":625,"correct":32},"项目人力管理制度",{"key":30,"text":627,"correct":22},"项目成本核算制度",{"key":34,"text":629,"correct":22},"项目信息管理制度",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":36,"analysis":37},1166929,"施工项目进度计划系统包括施工项目（ ）。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"项目总进度计划",{"key":24,"text":637,"correct":22},"单位工程进度计划",{"key":27,"text":639,"correct":22},"分部分项工程进度计划",{"key":30,"text":641,"correct":32},"材料进场计划",{"key":34,"text":643,"correct":22},"年度月度进度计划",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":112,"analysis":37},1166930,"施工项目投标阶段主要工作包括（ ）。",[648,650,652,654,656],{"key":20,"text":649,"correct":22},"由企业决策层或企业管理层按企业的经营战略对项目做出是否投标的决策",{"key":24,"text":651,"correct":22},"决定投标后收集掌握企业本身、相关单位、市场等诸多方面信息",{"key":27,"text":653,"correct":22},"编制投标书",{"key":30,"text":655,"correct":32},"做出工程造价",{"key":34,"text":657,"correct":32},"缴纳投标保证金",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":112,"analysis":37},1166931,"施工准备阶段的主要工作包括（ ）。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"由项目经理部编制开工报告",{"key":24,"text":665,"correct":22},"项目经理部抓紧做好各项施工准备",{"key":27,"text":667,"correct":22},"企业管理层委派项目经理",{"key":30,"text":669,"correct":32},"项目经理组织招聘劳务班组",{"key":34,"text":671,"correct":32},"项目经理组织购买大宗材料",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":67,"analysis":37},1166932,"下列工作中，属于施工阶段的有（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":32},"组建项目经理部",{"key":24,"text":679,"correct":22},"严格履行合同，协调好与建设单位、监理单位、设计单位等相关单位的关系",{"key":27,"text":681,"correct":32},"项目经理组织编制《施工项目管理实施规划》",{"key":30,"text":683,"correct":32},"项目经理部编写开工报告",{"key":34,"text":685,"correct":22},"管理施工现场，实现文明施工",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":256,"analysis":37},1166933,"下列各部门中，不属于项目经理部可设置的是（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":32},"经营核算部门",{"key":24,"text":693,"correct":32},"物质设备供应部门",{"key":27,"text":695,"correct":22},"设备检查检测部门",{"key":30,"text":697,"correct":32},"测试计量部门",{"key":34,"text":699,"correct":22},"企业工程管理部门",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":82,"analysis":37},1166934,"以下各项中不属于施工资源管理的任务的是（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"规划及报批施工用地",{"key":24,"text":707,"correct":32},"确定资源类型及数量",{"key":27,"text":709,"correct":32},"确定资源的分配计划",{"key":30,"text":711,"correct":22},"建立施工现场管理组织",{"key":34,"text":713,"correct":32},"施工资源进度计划的执行和动态调整",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":171,"analysis":37},1166935,"施工项目生产活动具有（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"独特性",{"key":24,"text":721,"correct":22},"流动性",{"key":27,"text":723,"correct":32},"施工的特殊性",{"key":30,"text":725,"correct":22},"工期长",{"key":34,"text":727,"correct":32},"施工条件复杂",{"id":729,"libraryId":5,"type":15,"typeLabel":16,"stem":730,"options":731,"answer":36,"analysis":37},1166936,"以下人员是施工现场的管理者（ ）。",[732,734,736,738,740],{"key":20,"text":733,"correct":22},"劳务员",{"key":24,"text":735,"correct":22},"造价员",{"key":27,"text":737,"correct":22},"资料员",{"key":30,"text":739,"correct":32},"检测员",{"key":34,"text":741,"correct":22},"安全员",[743,747,750,753,756,759],{"id":744,"name":745,"category":7,"favorite":746},1,"领导干部任职前廉政法规知识测试题",92,{"id":748,"name":749,"category":7,"favorite":744},595,"建筑结构与设备",{"id":751,"name":752,"category":7,"favorite":744},715,"招标采购专业知识与法律法规",{"id":754,"name":755,"category":7,"favorite":744},848,"市政方向-通用基础",{"id":757,"name":758,"category":7,"favorite":8},534,"BIM工程师",{"id":760,"name":758,"category":7,"favorite":8},535]