[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167353":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1167353,829,3,"判断题","劳务分包人的履约能力关系到工程项目最终成果的体现，要审查劳务分包人拥有符合本项目施工的劳务工人的数量、分别在施工的每个阶段可以在现场操作的高级、中级等技术工人的比例或姓名，劳务分包人在业内的评价和信誉并不是主要的。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"劳务分包人的履约能力关系到工程项目最终成果的体现，劳务分包人拥有符合本项目施工的劳务工人的数量、分别在施工的每个阶段可以在现场操作的高级、中级等技术工人的比例或姓名。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)基础知识","建筑工程",0]