[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167326":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1167326,829,3,"判断题","工程成本分为直接费和间接费。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"工程成本包括建造合同签订开始至合同完成止所发生的、与执行合同有关的直接费用和间接费用。",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)基础知识","建筑工程",0]