[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167154":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1167154,829,3,"判断题","降水工作应持续到基础（包括地下水位下回填土）施工完成。见教材第四章第一节P66。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"降水工作应持续到基础（包括地下水位下回填土）施工完成。单选题1.",{"id":6,"name":21,"category":22,"favorite":23},"(劳务员)基础知识","建筑工程",0]