[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1167033":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1167033,829,2,"多选题","在劳务分包合同履行管理阶段，涉及的任何（ ）等，都应当由相应的合同管理人员负责收集、记录、审查与合同的其他相关文件一并管理。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","文件",false,{"key":16,"text":17,"correct":18},"B","指令",true,{"key":20,"text":21,"correct":14},"C","调价",{"key":23,"text":24,"correct":18},"D","变更",{"key":26,"text":27,"correct":18},"E","请示","BDE","对各种书面文件和劳务分包合同条款的跟踪与监督：在劳务分包合同履行管理阶段，涉及的任何指令、变更、请示等，都应当由相应的合同管理人员负责收集、记录、审查与合同的其他相关文件一并管理。",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)基础知识","建筑工程",0]