[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166924":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1166924,829,2,"多选题","施工项目资源的分配计划包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","人员需求分配计划",true,{"key":16,"text":17,"correct":14},"B","物资需求分配计划",{"key":19,"text":20,"correct":14},"C","设备和设施需求分配计划",{"key":22,"text":23,"correct":14},"D","资金需求分配计划",{"key":25,"text":26,"correct":27},"E","安全防护需求分配计划",false,"ABCD","施工项目资源的分配计划包括人员需求分配计划、物资需求分配计划、设备和设施需求分配计划、资金需求分配计划",{"id":6,"name":31,"category":32,"favorite":33},"(劳务员)基础知识","建筑工程",0]