[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166866":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1166866,829,1,"单选题","施工单位对建设工程的（ ）负责，总承包单位与分包单位对分包工程的质量承担连带责任。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工质量",true,{"key":16,"text":17,"correct":18},"B","施工安全",false,{"key":20,"text":21,"correct":18},"C","施工进展",{"key":23,"text":24,"correct":18},"D","施工成本","施工单位对建设工程的施工质量负责。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]