[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166709":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1166709,829,1,"单选题","在一个会计年度内完成的施工承包合同，应在（ ）确认合同收人。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","资产负债表日",false,{"key":16,"text":17,"correct":18},"B","合同完成时",true,{"key":20,"text":21,"correct":14},"C","合同完成年末",{"key":23,"text":24,"correct":14},"D","合同规定的时期","在一个会计年度内完成的施工承包合同，应在合同完成时确认合同收人。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]