[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166692":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1166692,829,1,"单选题","在合同实施过程中，客户要求追加建造资产，当满足下列条件之一的，应当视为单项合同，并作为独立会计核算对象（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","该追加资产在设计、技术或功能上与原合同包括的一项或数项资产存在重大差异",true,{"key":16,"text":17,"correct":18},"B","议定该追加资产的造价时，需要考虑原合同价款",false,{"key":20,"text":21,"correct":18},"C","该追加资产在设计、技术或功能上与原合同包括的一项或数项资产存在较小差异",{"key":23,"text":24,"correct":18},"D","该合同项下的单项资产有独立的建造计划，且客户单独办理结算","在合同实施过程中，客户要求追加建造资产，当满足该追加资产在设计、技术或功能上与原合同包括的一项或数项资产存在重大差异，应当视为单项合同，并作为独立会计核算对象。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]