[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166605":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1166605,829,1,"单选题","就施工项目而言，人力资源的配置依据是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人力资源需求计划",false,{"key":16,"text":17,"correct":18},"B","施工进度计划",true,{"key":20,"text":21,"correct":14},"C","员工职业规划",{"key":23,"text":24,"correct":14},"D","企业发展计划","就施工项目而言，人力资源的配置依据是施工进度计划。此外还要考虑生产力的发展、市场需求、技术进步、市场竞争、职工年龄结构、知识结构、技能结构等因素的变化。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]