[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166450":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1166450,829,1,"单选题","以下不属于施工资源管理任务的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","规划及报批施工用地",true,{"key":16,"text":17,"correct":18},"B","确定资源的分配计划",false,{"key":20,"text":21,"correct":18},"C","编制资源进度计划",{"key":23,"text":24,"correct":18},"D","施工资源进度计划的执行和动态凋整","施工资源管理的任务：确定资源类型及数量；确定资源的分配计划；编制资源进度计划；施工资源进度计划的执行和动态调整。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]