[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166448":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1166448,829,1,"单选题","在竣工交付验收签字之日起（ ）日内，项目经理部要向企业工程管理部写出项目经理部解体申请报告，同时提出善后留用和遣散人员的名单及时间，经有关部门审核批准后执行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":18},"B","15",true,{"key":20,"text":21,"correct":14},"C","21",{"key":23,"text":24,"correct":14},"D","30","在竣工交付验收签字之日起15日内，项目经理部要向企业工程管理部写出项目经理部解体申请报告，同时提出善后留用和遣散人员的名单及时间，经有关部门审核批准后执行。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]