[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166439":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1166439,829,1,"单选题","以下不属于施工项目质量控制措施的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","组织措施、技术措施、合同措施、经济措施、信息管理措施等",true,{"key":16,"text":17,"correct":18},"B","提高管理、施工及操作人员自身素质",false,{"key":20,"text":21,"correct":18},"C","建立完善的质量保证体系",{"key":23,"text":24,"correct":18},"D","加强原材料质量控制","施工项目质量控制的措施：1）提高管理、施工及操作人员自身素质；2）建立完善的质量保证体系；3）加强原材料质量控制；4）提高施工的质量管理水平；5）确保施工工序的质量；6）加强施工项目的过程控制。",{"id":6,"name":27,"category":28,"favorite":29},"(劳务员)基础知识","建筑工程",0]