[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1166075":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1166075,828,2,"多选题","施工现场用电线路必须在( )做重复接地。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","总配电箱",true,{"key":16,"text":17,"correct":14},"B","配电线路中间",{"key":19,"text":20,"correct":21},"C","开关箱",false,{"key":23,"text":24,"correct":14},"D","末端",{"key":26,"text":27,"correct":21},"E","顶端","ABD","",{"id":6,"name":31,"category":32,"favorite":33},"通用基础","建筑工程",0]