[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1165785":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1165785,827,3,"判断题","单机大修理成本核算是由修理单位对大修竣工的建筑机械按照修理定额中划分的项目,分项计算其实际成本。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"岗位技能","建筑工程",0]