[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1165743":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1165743,827,2,"多选题","安装单位应当按照建筑起重机械( )组织安装、拆卸作业。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","国家有关标准",false,{"key":16,"text":17,"correct":14},"B","使用说明书",{"key":19,"text":20,"correct":21},"C","安装、拆卸专项施工方案",true,{"key":23,"text":24,"correct":21},"D","安全操作规程",{"key":26,"text":27,"correct":14},"E","相关法规","CD","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]