[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-826-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},826,"(机械员)专业管理实务 岗位知识","建筑工程",0,4,50,1013,[13,34,46,55,67,79,91,103,115,127,139,151,161,173,182,191,203,215,226,238,247,259,270,281,293,305,317,325,336,348,360,370,382,391,403,415,427,439,447,459,471,480,490,502,511,519,531,543,555,563],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1164613,1,"单选题","架设绝缘隔离防护设施时，必须经有关部门批准。架设时采用线路暂时停电或其他可靠的（ ）措施，并应有电气工程技术人员和专职安全人员监护。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","安全技术",true,{"key":24,"text":25,"correct":26},"B","施工技术",false,{"key":28,"text":29,"correct":26},"C","设计",{"key":31,"text":32,"correct":26},"D","监理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1164614,"当绝缘隔离防护措施无法实现时，必须与有关部门协商，采取停电、迁移外电线路或改变工程位置等措施，未采取上述措施的（ ）施工。",[38,40,42,44],{"key":20,"text":39,"correct":22},"严禁",{"key":24,"text":41,"correct":26},"可以",{"key":28,"text":43,"correct":26},"应该",{"key":31,"text":45,"correct":26},"能够",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1164615,"在建工程（ ）在外电架空线路正下方施工、搭设作业棚、建造生活设施或堆放构件、架具、材料及其他杂物等。",[50,52,53,54],{"key":20,"text":51,"correct":22},"不得",{"key":24,"text":41,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":20,"analysis":33},1164616,"每台用电设备必须有各自专用的开关箱，严禁用同一个开关箱直接控制（台及其以上用电设备（含插座）。",[59,61,63,65],{"key":20,"text":60,"correct":22},"2",{"key":24,"text":62,"correct":26},"3",{"key":28,"text":64,"correct":26},"4",{"key":31,"text":66,"correct":26},"5",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":28,"analysis":33},1164617,"配电系统应设置配电柜或总配电箱、分配电箱、开关箱，实行（ ）配电。",[71,73,75,77],{"key":20,"text":72,"correct":26},"一级",{"key":24,"text":74,"correct":26},"二级",{"key":28,"text":76,"correct":22},"三级",{"key":31,"text":78,"correct":26},"四级",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1164618,"施工现场特别潮湿场所在使用安全电压额定值时应选用（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":26},"48V；",{"key":24,"text":86,"correct":26},"36V；",{"key":28,"text":88,"correct":26},"4V；",{"key":31,"text":90,"correct":22},"12V",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":28,"analysis":33},1164619,"起重机严禁越过无防护设施的外电架空线路作业。在外电架空线路附近吊装时，起重机的任何部位或被吊物边缘在最大偏斜时与架空线路边线的（ ）安全距离应符合规定。",[95,97,99,101],{"key":20,"text":96,"correct":26},"最长",{"key":24,"text":98,"correct":26},"最远",{"key":28,"text":100,"correct":22},"最小",{"key":31,"text":102,"correct":26},"最大",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1164620,"施工现场临时用电必须建立安全技术档案，（ ）由项目经理审核认可，并应在临时用电工程拆除后统一归档。",[107,109,111,113],{"key":20,"text":108,"correct":26},"每天",{"key":24,"text":110,"correct":22},"每周",{"key":28,"text":112,"correct":26},"每月",{"key":31,"text":114,"correct":26},"每年",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1164621,"导线截面的选择，不需要考虑以下哪一项（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":26},"机械强度",{"key":24,"text":122,"correct":22},"电阻大小",{"key":28,"text":124,"correct":26},"电流密度",{"key":31,"text":126,"correct":26},"电压降",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},1164622,"总配电箱中漏电保护器的额定漏电动作电流不应大于（ ）m A，额定漏电动作时间不应大于0.尽但其额定漏电动作电流与额定漏电动作时间的乘积不应大于30mAs。",[131,133,135,137],{"key":20,"text":132,"correct":26},"20",{"key":24,"text":134,"correct":22},"30",{"key":28,"text":136,"correct":26},"40",{"key":31,"text":138,"correct":26},"50",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},1164623,"配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为1.4~1.6。移动式配电箱、开关箱其中心点与地面的垂直距离宜为（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":26},"2.8~3.6m",{"key":24,"text":146,"correct":26},"4.8~5.6m",{"key":28,"text":148,"correct":22},"0.8~1.6m",{"key":31,"text":150,"correct":26},"3.8~4.6m",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1164624,"施工现场的机动车道与外电架空线路交叉时，架空线路的（ ）点与路面的最小垂直距离应符合规定。",[155,157,159,160],{"key":20,"text":156,"correct":26},"最高",{"key":24,"text":158,"correct":22},"最低",{"key":28,"text":98,"correct":26},{"key":31,"text":96,"correct":26},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},1164625,"剩余电流保护装置运行管理单位应（ ）检查分析剩余电流保护装置的使用情况，对已发现的有故障的剩余电流保护装置应立即更换。",[165,167,169,171],{"key":20,"text":166,"correct":22},"定期",{"key":24,"text":168,"correct":26},"抽查",{"key":28,"text":170,"correct":26},"经常",{"key":31,"text":172,"correct":26},"不定期",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1164626,"碘钨灯及钠、钴、铟等金属卤化物灯具的安装高度宜在（ ）m以上，灯线应固定在接线柱上，不得靠近灯具表面。",[177,178,179,180],{"key":20,"text":62,"correct":22},{"key":24,"text":64,"correct":26},{"key":28,"text":66,"correct":26},{"key":31,"text":181,"correct":26},"6",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},1164627,"在金属物体上工作，操作手持式电动工具或使用非安全电压的行灯时，应选用额定剩余动作电流为（ ）m A，一般型（无延时）的剩余电流保护装置。",[186,188,189,190],{"key":20,"text":187,"correct":22},"10",{"key":24,"text":132,"correct":26},{"key":28,"text":134,"correct":26},{"key":31,"text":136,"correct":26},{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":28,"analysis":33},1164628,"动力配电箱与照明配电箱宜分别设置。当合并设置为同一配电箱时，动力与照明应分路配电；动力开关箱与照明开关箱必须（ ）。",[195,197,199,201],{"key":20,"text":196,"correct":26},"通用",{"key":24,"text":198,"correct":26},"共用",{"key":28,"text":200,"correct":22},"分设",{"key":31,"text":202,"correct":26},"合设",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":28,"analysis":33},1164629,"隧道、人防工程、高温、有导电灰尘、比较潮湿或灯具离地面高度低于2.5m等场所的照明，电源电压不应大于（ ）。",[207,209,211,213],{"key":20,"text":208,"correct":26},"220",{"key":24,"text":210,"correct":26},"380",{"key":28,"text":212,"correct":22},"36",{"key":31,"text":214,"correct":26},"48",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":31,"analysis":33},1164630,"临时用电工程应定期按分部、分项工程进行检查，对（ ）隐患必须及时处理，并应履行复查验收手续。",[219,221,222,224],{"key":20,"text":220,"correct":26},"验收",{"key":24,"text":29,"correct":26},{"key":28,"text":223,"correct":26},"施工",{"key":31,"text":225,"correct":22},"安全",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1164631,"剩余电流保护装置对电网的要求：安装剩余电流保护装置的电动机及其他电气设备在正常运行时的绝缘电阻不应小于（ ）M?。",[230,232,234,236],{"key":20,"text":231,"correct":22},"0.5",{"key":24,"text":233,"correct":26},"1.0",{"key":28,"text":235,"correct":26},"1.5",{"key":31,"text":237,"correct":26},"2.0",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1164632,"临时用电工程必须经编制、审核、批准部门和使用单位共同（ ），合格后方可投人使用。",[242,243,244,245],{"key":20,"text":220,"correct":22},{"key":24,"text":29,"correct":26},{"key":28,"text":223,"correct":26},{"key":31,"text":246,"correct":26},"检查",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},1164633,"电气设备的保护零线与工作零线分开设置的系统，即称为（ ）系统。",[251,253,255,257],{"key":20,"text":252,"correct":26},"TT；",{"key":24,"text":254,"correct":26},"TN—C；",{"key":28,"text":256,"correct":26},"TN；",{"key":31,"text":258,"correct":22},"TN—S",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1164634,"低压供用电系统中为了缩小发生人身电击事故和接地故障切断电源时引起的停电范围，剩余电流保护装置应采用（ ）保护。",[263,265,266,268],{"key":20,"text":264,"correct":22},"分级",{"key":24,"text":72,"correct":26},{"key":28,"text":267,"correct":26},"特级",{"key":31,"text":269,"correct":26},"重点",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},1164635,"无法进行自然采光的地下大空间施工场所，（ ）编制单项照明电方案。",[274,276,278,280],{"key":20,"text":275,"correct":22},"应",{"key":24,"text":277,"correct":26},"不必",{"key":28,"text":279,"correct":26},"无需",{"key":31,"text":51,"correct":26},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1164636,"羊角式非自动复位式开关属于（ ）行程开关。",[285,287,289,291],{"key":20,"text":286,"correct":26},"直动式",{"key":24,"text":288,"correct":22},"滚轮式",{"key":28,"text":290,"correct":26},"微动式",{"key":31,"text":292,"correct":26},"组合式",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1164637,"各类用电人员应掌握安全用电基本知识和所用设备的（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"技术",{"key":24,"text":300,"correct":22},"性能",{"key":28,"text":302,"correct":26},"水平",{"key":31,"text":304,"correct":26},"能力",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":31,"analysis":33},1164638,"下列不属于TN系统的是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":26},"TN-S系统",{"key":24,"text":312,"correct":26},"TN-C系统",{"key":28,"text":314,"correct":26},"TN-C-S系统",{"key":31,"text":316,"correct":22},"YN-S-C系统",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1164639,"总配电箱以下可设若干分配电箱，分配电箱以下可设若干开关箱。分配电箱与开关箱的距离不得超过（ ）m，开关箱与控制的固定用电设备的水平距离不宜超过3m。",[321,322,323,324],{"key":20,"text":132,"correct":26},{"key":24,"text":134,"correct":22},{"key":28,"text":136,"correct":26},{"key":31,"text":138,"correct":26},{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":20,"analysis":33},1164640,"剩余电流保护装置的安装（ ）由经技术考核合格的专业人员进行。",[329,331,332,334],{"key":20,"text":330,"correct":22},"必须",{"key":24,"text":41,"correct":26},{"key":28,"text":333,"correct":26},"不需",{"key":31,"text":335,"correct":26},"一般",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":28,"analysis":33},1164641,"配电箱、开关箱应安装端正、牢固。固定式闸箱的中心点距地面的垂直距离应为：（ ），移动式配电箱、开关箱应装设在坚固的支架上，其中心点距地面的垂直距离为：0.8~1.6m。落地式配电箱的底座宜抬高，室内高出地面50mm以上，室外高出地面200mm以上。",[340,342,344,346],{"key":20,"text":341,"correct":26},"1.2~1.4m",{"key":24,"text":343,"correct":26},"1.3~1.5m",{"key":28,"text":345,"correct":22},"1.4~1.6m",{"key":31,"text":347,"correct":26},"1.5~1.7m",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1164642,"路灯的每个灯具应单独装设熔断器保护，灯头线应做（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"防水",{"key":24,"text":355,"correct":26},"防盗",{"key":28,"text":357,"correct":26},"防火",{"key":31,"text":359,"correct":26},"防撞",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":28,"analysis":33},1164643,"施工现场临时用电必须建立安全（ ）档案。",[364,366,367,368],{"key":20,"text":365,"correct":26},"业务",{"key":24,"text":302,"correct":26},{"key":28,"text":298,"correct":22},{"key":31,"text":369,"correct":26},"资料",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1164644,"临时用电组织设计，应绘制临时用电工程图纸，主要包括用电工程（ ）、配电装置布置图、配电系统接线图、接地装置设计图。",[374,376,378,380],{"key":20,"text":375,"correct":22},"总平面图",{"key":24,"text":377,"correct":26},"剖面图",{"key":28,"text":379,"correct":26},"立面图",{"key":31,"text":381,"correct":26},"效果图",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1164645,"电气设备的金属外壳可能因绝缘损坏而带电，为防止这种电压危及人身安全而人为地将电气设备的外露可导电部分与大地作良好的连接称为保护接地。保护接地的接地电阻不大于（ ）?。",[386,387,388,389],{"key":20,"text":132,"correct":26},{"key":24,"text":187,"correct":26},{"key":28,"text":64,"correct":22},{"key":31,"text":390,"correct":26},"8",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1164646,"施工现场用电工程中，PE线上每处重复接地的接地电阻值不应大于（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"4Ω",{"key":24,"text":398,"correct":22},"10Ω",{"key":28,"text":400,"correct":26},"30Ω",{"key":31,"text":402,"correct":26},"100Ω",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1164647,"施工现场临时用电设备在（ ）台及以上或设备总容量在（ ）KW及以上者，应编制用电组织设计。",[407,409,411,413],{"key":20,"text":408,"correct":22},"（5，50）",{"key":24,"text":410,"correct":26},"（6，60）",{"key":28,"text":412,"correct":26},"（7，70）",{"key":31,"text":414,"correct":26},"（8，80）",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":24,"analysis":33},1164648,"潮湿场所开关箱中的漏电保护器，其额定漏电动作电流为（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":26},"15mA",{"key":24,"text":422,"correct":22},"不大于15mA",{"key":28,"text":424,"correct":26},"30mA",{"key":31,"text":426,"correct":26},"不大于30mA",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},1164649,"配电箱与开关箱内的漏电保护器极数和线数必须与其负荷侧负荷的相数和线数（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":26},"大",{"key":24,"text":434,"correct":26},"小",{"key":28,"text":436,"correct":22},"一致",{"key":31,"text":438,"correct":26},"不同",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},1164650,"配电箱与开关箱内电源进线端严禁采用插头和插座做活动连接。漏电保护器每天使用前应启动漏电试验按钮试跳一次，试跳不正常时（ ）继续使用。",[443,444,445,446],{"key":20,"text":43,"correct":26},{"key":24,"text":45,"correct":26},{"key":28,"text":39,"correct":22},{"key":31,"text":41,"correct":26},{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},1164651,"施工现场用电工程中，PE线的重复接地点不应少于（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":26},"一处",{"key":24,"text":454,"correct":26},"二处",{"key":28,"text":456,"correct":22},"三处",{"key":31,"text":458,"correct":26},"四处",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1164652,"固定式配电箱、开关箱的中心点与地面的垂直距离应大于小于米，移动式分配电箱、开关箱中心点与地面的垂直距离宜大于小于米。",[463,465,467,469],{"key":20,"text":464,"correct":22},"1.4，1.6；0.8，1.6",{"key":24,"text":466,"correct":26},"0.8，1.6；1.4，1.6",{"key":28,"text":468,"correct":26},"1.8，1.4；0.8，1.6",{"key":31,"text":470,"correct":26},"0.8，1.4；0.8，1.6",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":28,"analysis":33},1164653,"在施工现场专用变压器的供电的TN-s接零保护系统中，电气设备的金属外壳（ ）与保护零线连接。保护零线应由工作接地线、配电室（总配电箱）电源侧零线或总漏电保护器电源侧零线处引出。",[475,477,478,479],{"key":20,"text":476,"correct":26},"不应",{"key":24,"text":51,"correct":26},{"key":28,"text":330,"correct":22},{"key":31,"text":41,"correct":26},{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":28,"analysis":33},1164654,"工地临时用电线路较长，用电设备较多，临时用电安全是施工顺利进行的保障。请根据实际情况回答下列问题。 经计算，照明线路的负荷电流为10 A，选择熔丝的额定电流应为（ ）A。",[484,486,487,489],{"key":20,"text":485,"correct":26},"7.5",{"key":24,"text":187,"correct":26},{"key":28,"text":488,"correct":22},"12",{"key":31,"text":132,"correct":26},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1164655,"施工项目部应严格执行机械设备（ ）制度，认真填写设备运转、保养、维修记录。",[494,496,498,500],{"key":20,"text":495,"correct":26},"“三定”",{"key":24,"text":497,"correct":22},"交接班",{"key":28,"text":499,"correct":26},"安全检查",{"key":31,"text":501,"correct":26},"持证操作",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1164656,"根据修理类别的不同，机械的修理可以分为（ ）类。",[506,508,509,510],{"key":20,"text":507,"correct":26},"1",{"key":24,"text":60,"correct":26},{"key":28,"text":62,"correct":22},{"key":31,"text":64,"correct":26},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1164657,"施工机械特种作业人员必须经过特种作业人员岗位培训，建筑施工企业还应对施工机械管理和操作人员经常性地进行机械安全教育，机械安全教育每年不得少于（ ）次。",[515,516,517,518],{"key":20,"text":507,"correct":22},{"key":24,"text":60,"correct":26},{"key":28,"text":62,"correct":26},{"key":31,"text":64,"correct":26},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},1164658,"大型起重机械现场事故应急救援领导小组中，主要负责事故发生后现场指挥工作的是（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"指挥组",{"key":24,"text":526,"correct":26},"抢救组",{"key":28,"text":528,"correct":26},"人员疏散组",{"key":31,"text":530,"correct":26},"排障组",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1164659,"（ ）是施工企业管理的一项基本制度，覆盖设备管理的全过程。",[535,537,539,541],{"key":20,"text":536,"correct":26},"建筑机械检查制度",{"key":24,"text":538,"correct":22},"建筑机械管理制度",{"key":28,"text":540,"correct":26},"安全生产责任制",{"key":31,"text":542,"correct":26},"安全教育制度",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},1164660,"针对设备的结构和使用特点及存在问题，在满足工艺要求的前提下，对设备的一个或几个项目进行的部分修理是（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":26},"整机大修",{"key":24,"text":550,"correct":26},"中修",{"key":28,"text":552,"correct":26},"小修",{"key":31,"text":554,"correct":22},"应急修理",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":33},1164661,"大型起重机械现场事故应急救援领导小组中，主要负责事故发生后疏散与抢险、抢救工作无关人员的是（ ）。",[559,560,561,562],{"key":20,"text":524,"correct":26},{"key":24,"text":526,"correct":26},{"key":28,"text":528,"correct":22},{"key":31,"text":530,"correct":26},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},1164662,"工作量较大的一类修理，一般要求对设备进行部分解体、修复或更换磨损的部件，校正设备的基准，使设备的主要精度达到工艺要求，这是施工机械的（ ）。",[567,568,569,570],{"key":20,"text":548,"correct":26},{"key":24,"text":550,"correct":22},{"key":28,"text":552,"correct":26},{"key":31,"text":554,"correct":26},[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]