[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-826-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},826,"(机械员)专业管理实务 岗位知识","建筑工程",0,3,50,1013,[13,34,46,58,70,82,94,106,118,130,142,150,158,170,178,187,199,211,223,235,247,259,271,283,295,307,319,329,340,352,364,376,388,400,412,424,436,448,456,468,480,491,503,515,527,536,546,558,569,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1164563,1,"单选题","以下不属于施工机械经常修理费的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","施工机械除大修理以外的各级保养和临时故障排除所需的费用",false,{"key":24,"text":25,"correct":22},"B","为保障机械正常运转所需替换与随机配备工具附具的摊销和维护费用",{"key":27,"text":28,"correct":22},"C","机械运转及日常保养所需润滑与擦拭的材料费用及机械停滞期间的维护和保养费用",{"key":30,"text":31,"correct":32},"D","施工机械按规定的大修理间隔台班进行必要的大修理，以恢复其正常功能所需的费用",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1164564,"寿命期大修理次数指施工机械在其寿命期（耐用总台班）内规定的大修理次数。寿命期大修理次数应参照（ ）确定。",[38,40,42,44],{"key":20,"text":39,"correct":32},"《全国统一\\t保养修理技术经济定额》",{"key":24,"text":41,"correct":22},"机械设备厂家要求",{"key":27,"text":43,"correct":22},"操作人员要求",{"key":30,"text":45,"correct":22},"维修人员要求",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1164565,"施工机械经济核算是企业经济核算的重要组成部分。请回答下列施工机械经济核算问题。 （ ），计算出机械设备总成本的步骤称为成本核算程序，上述情形建设行政主管机关最少要对甲企业罚款（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"从施工机械开始使用、成本开始发生，到工程结束",{"key":24,"text":53,"correct":22},"从施工机械购置开始、成本开始发生，到工程结束",{"key":27,"text":55,"correct":22},"从施工机械开始使用、成本开始发生，到报废",{"key":30,"text":57,"correct":22},"从施工机械购置开始、成本开始发生，到报废",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1164566,"以下关于施工机械设备成本核算原则正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"成本核算资料按一定的原则由不同的会计人员加以核算，可能得不同的结果",{"key":24,"text":65,"correct":22},"企业应定期核算机械成本。成本核算的分期，可以与会计年度的分月、分季、分年不一致",{"key":27,"text":67,"correct":32},"应由本期成本负担的费用，不论是否已经支付，都要计入本期成本",{"key":30,"text":69,"correct":22},"所耗用的原材料、燃料、动力可以采用定额成本、标准成本计算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1164567,"对单台建筑机械从购入到报废整个寿命期中的经济成果核算称为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"收入核算",{"key":24,"text":77,"correct":22},"成本支出核算",{"key":27,"text":79,"correct":32},"寿命周期费用核算",{"key":30,"text":81,"correct":22},"盈亏核算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1164568,"建筑机械租赁计价方式不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"日计租",{"key":24,"text":89,"correct":22},"月计租",{"key":27,"text":91,"correct":22},"台班计租",{"key":30,"text":93,"correct":22},"台时计租",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1164569,"（ ）是指对各项经济业务中发生的成本，都必须按一定的标准和范围加以认定和记录。",[98,100,102,104],{"key":20,"text":99,"correct":32},"确认原则",{"key":24,"text":101,"correct":22},"相关性原则",{"key":27,"text":103,"correct":22},"一贯性原则",{"key":30,"text":105,"correct":22},"配比原则",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1164570,"由班组管理的中小型机械，一般适合于（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"单机核算",{"key":24,"text":113,"correct":22},"人机核算",{"key":27,"text":115,"correct":32},"班组核算",{"key":30,"text":117,"correct":22},"维修核算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1164571,"施工机械变动成本包括（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"折旧费",{"key":24,"text":125,"correct":32},"电费",{"key":27,"text":127,"correct":22},"年检费",{"key":30,"text":129,"correct":22},"养路费",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1164572,"施工机械单机核算的收人核算，即（ ）核算。",[134,136,138,140],{"key":20,"text":135,"correct":32},"施工定额",{"key":24,"text":137,"correct":22},"固定成本",{"key":27,"text":139,"correct":22},"变动成本",{"key":30,"text":141,"correct":22},"效益",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1164573,"（ ）是指企业成本核算所采用的方法应前后一致。",[146,147,148,149],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":32},{"key":30,"text":105,"correct":22},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1164574,"（ ）也称“决策有用原则”。",[154,155,156,157],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":32},{"key":27,"text":103,"correct":22},{"key":30,"text":105,"correct":22},{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},1164575,"以下不属于施工机械的单机核算内容的是（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":32},"施工现场项目经理工资",{"key":24,"text":165,"correct":22},"施工机械操作人员工资",{"key":27,"text":167,"correct":22},"收人核算",{"key":30,"text":169,"correct":22},"成本核算",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":27,"analysis":33},1164576,"建筑机械租赁计价方式中，（ ）主要是指按台班租赁的建筑机械的租金结算。",[174,175,176,177],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":32},{"key":30,"text":93,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1164577,"（ ）是指企业核算要采用实际成本计价。",[182,183,184,186],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":27,"text":185,"correct":32},"实际成本核算原则",{"key":30,"text":105,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1164578,"建筑机械（ ）分为固定支出和变动支出两部分。",[191,193,195,197],{"key":20,"text":192,"correct":22},"收入",{"key":24,"text":194,"correct":32},"成本支出",{"key":27,"text":196,"correct":22},"利润",{"key":30,"text":198,"correct":22},"核算盈亏",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1164579,"施工机械设备成本核算相关性原则，包括成本信息的（ ）和及时性。",[203,205,207,209],{"key":20,"text":204,"correct":22},"真实性",{"key":24,"text":206,"correct":32},"有用性",{"key":27,"text":208,"correct":22},"重要性",{"key":30,"text":210,"correct":22},"一致性",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":30,"analysis":33},1164580,"施工机械设备成本核算原则不包括（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"可靠性原则",{"key":24,"text":218,"correct":22},"分期核算原则",{"key":27,"text":220,"correct":22},"实际成本计价原则",{"key":30,"text":222,"correct":32},"所耗用的原材料、燃料、动力按定额计算",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1164581,"施工机械变动成本中，（ ）支出较大，是管理重点。",[227,229,231,233],{"key":20,"text":228,"correct":22},"配件费",{"key":24,"text":230,"correct":32},"动力、燃料费",{"key":27,"text":232,"correct":22},"保养费",{"key":30,"text":234,"correct":22},"人员工资",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},1164582,"电气设备的某部分与大地之间做良好的电气连接，称为接地。接地体，或称接地极是指埋人地中并直接与大地接触的（ ）。",[239,241,243,245],{"key":20,"text":240,"correct":22},"石块",{"key":24,"text":242,"correct":22},"木块",{"key":27,"text":244,"correct":32},"金属导体",{"key":30,"text":246,"correct":22},"绝缘体",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},1164583,"（ ）行程开关动作原理同按钮类似，所不同的是一个是手动，另一个则由运动部件的撞块相碰。",[251,253,255,257],{"key":20,"text":252,"correct":32},"直动式",{"key":24,"text":254,"correct":22},"滚轮式",{"key":27,"text":256,"correct":22},"微动式",{"key":30,"text":258,"correct":22},"组合式",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1164584,"现场照明应采用（ ）光效、长寿命的照明光源。对需大面积照明的场所，应采用高压汞灯、高压钠灯或混光用的卤钨灯等。",[263,265,267,269],{"key":20,"text":264,"correct":32},"高",{"key":24,"text":266,"correct":22},"低",{"key":27,"text":268,"correct":22},"小",{"key":30,"text":270,"correct":22},"短",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":27,"analysis":33},1164585,"分配电箱与开关箱的距离不得超过（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"10m",{"key":24,"text":278,"correct":22},"20m",{"key":27,"text":280,"correct":32},"30m",{"key":30,"text":282,"correct":22},"40m",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},1164586,"工地临时用电线路较长，用电设备较多，临时用电安全是施工顺利进行的保障。请根据实际情况回答下列问题。 分配电箱和开关箱的距离不得超过（ ）m。",[287,289,291,293],{"key":20,"text":288,"correct":22},"10",{"key":24,"text":290,"correct":22},"20",{"key":27,"text":292,"correct":32},"30",{"key":30,"text":294,"correct":22},"40",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":33},1164587,"固定式配电箱、开关箱中心点与地面的相对高度应为（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"0.5m",{"key":24,"text":302,"correct":22},"1.0m",{"key":27,"text":304,"correct":32},"1.5m",{"key":30,"text":306,"correct":22},"1.8m",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},1164588,"临时用电组织设计应按照工程规模、场地特点、负荷性质、用电容量、地区供用电条件等实际情况，合理确定（ ）方案。",[311,313,315,317],{"key":20,"text":312,"correct":22},"验收",{"key":24,"text":314,"correct":32},"设计",{"key":27,"text":316,"correct":22},"施工",{"key":30,"text":318,"correct":22},"检查",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":20,"analysis":33},1164589,"剩余电流保护装置动作参数的选择：手持式电动工具、移动电器、家用电器等设备应优先选用额定剩余动作电流不大于（ ）m A、一般型（无延时）的剩余电流保护装置。",[323,324,325,327],{"key":20,"text":292,"correct":32},{"key":24,"text":294,"correct":22},{"key":27,"text":326,"correct":22},"50",{"key":30,"text":328,"correct":22},"60",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1164590,"施工现场用电线路必须在（ ）做重复接地，且重复接地装置阻值应不得大于（ ）欧：",[333,335,336,338],{"key":20,"text":334,"correct":22},"总配电室、线路中间和末端；10",{"key":24,"text":334,"correct":32},{"key":27,"text":337,"correct":22},"总配电柜、二级箱、末级箱；4",{"key":30,"text":339,"correct":22},"总配电柜、分配箱、开关箱；5",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},1164591,"施工现场的临时用电电力系统（ ）利用大地做相线或零线。",[344,346,348,350],{"key":20,"text":345,"correct":32},"严禁",{"key":24,"text":347,"correct":22},"可以",{"key":27,"text":349,"correct":22},"应该",{"key":30,"text":351,"correct":22},"能够",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":27,"analysis":33},1164592,"正常条件下，开关箱内漏电保护器额定漏电动作电流及漏电动作时间为：（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"30mA，0.01S",{"key":24,"text":359,"correct":22},"50mA，0.1S",{"key":27,"text":361,"correct":32},"30mA，0.1S",{"key":30,"text":363,"correct":22},"50mA，0.01S",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":30,"analysis":33},1164593,"临时用电组织设计及变更用电时，必须履行“（ ）”程序，由电气工程技术人员组织编制，经相关部门审核及具有法人资格企业的技术负责人批准后实施。",[368,370,372,374],{"key":20,"text":369,"correct":22},"编制",{"key":24,"text":371,"correct":22},"审核",{"key":27,"text":373,"correct":22},"批准",{"key":30,"text":375,"correct":32},"三项都是",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1164594,"开关箱与用电设备的水平距离不宜超过（ ）。",[380,382,384,386],{"key":20,"text":381,"correct":32},"3m",{"key":24,"text":383,"correct":22},"4m",{"key":27,"text":385,"correct":22},"5m",{"key":30,"text":387,"correct":22},"6m",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":27,"analysis":33},1164595,"临时用电工程应定期检查。定期检查时，应复查（ ）电阻值和绝缘电阻值。",[392,394,396,398],{"key":20,"text":393,"correct":22},"接线",{"key":24,"text":395,"correct":22},"接触",{"key":27,"text":397,"correct":32},"接地",{"key":30,"text":399,"correct":22},"连接",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},1164596,"潮湿和易触及带电体场所的照明，电源电压不得大于（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"220",{"key":24,"text":407,"correct":22},"380",{"key":27,"text":409,"correct":32},"24",{"key":30,"text":411,"correct":22},"36",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":30,"analysis":33},1164597,"一般场所开关箱漏电保护器，其额定漏电动作电流为（ ）。",[416,418,420,422],{"key":20,"text":417,"correct":22},"10mA",{"key":24,"text":419,"correct":22},"20mA",{"key":27,"text":421,"correct":22},"30mA",{"key":30,"text":423,"correct":32},"不大于30mA",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1164598,"对夜间影响飞机或车辆通行的在建工程及机械设备，必须设置醒目的（ ）信号灯，其电源应设在施工现场总电源开关的前侧，并应设置外电线路停止供电时的应急自备电源。",[428,430,432,434],{"key":20,"text":429,"correct":22},"黄色",{"key":24,"text":431,"correct":32},"红色",{"key":27,"text":433,"correct":22},"蓝色",{"key":30,"text":435,"correct":22},"绿色",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},1164599,"临时电工必须经过按国家现行标准考核合格后，（ ）上岗工作",[440,442,444,446],{"key":20,"text":441,"correct":32},"持证",{"key":24,"text":443,"correct":22},"考试",{"key":27,"text":445,"correct":22},"考查",{"key":30,"text":447,"correct":22},"注册",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1164600,"剩余电流保护装置用于直接接触电击事故防护时，应选用一般型（无延时）的剩余电流保护装置，其额定剩余动作电流不超过（ ）mA。",[452,453,454,455],{"key":20,"text":292,"correct":32},{"key":24,"text":294,"correct":22},{"key":27,"text":326,"correct":22},{"key":30,"text":328,"correct":22},{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},1164601,"普通灯具与易燃物距离不宜小于（ ）mm聚光灯、碘钨灯等高热灯具与易燃物距离不宜小于500mm，且不得直接照射易燃物。达不到规定安全距离时，应采取隔热措施。",[460,462,464,466],{"key":20,"text":461,"correct":32},"300",{"key":24,"text":463,"correct":22},"200",{"key":27,"text":465,"correct":22},"100",{"key":30,"text":467,"correct":22},"180",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},1164602,"总配电箱应设在靠近电源的地区，分配电箱应设在用电设备负荷相对集中的地区，分配电箱与开关箱的距离不得超过米，开关箱与其控制的固定式用电设备的水平距离不宜超过米。",[472,474,476,478],{"key":20,"text":473,"correct":22},"35，5",{"key":24,"text":475,"correct":22},"35，3",{"key":27,"text":477,"correct":32},"30，3",{"key":30,"text":479,"correct":22},"50，5",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":27,"analysis":33},1164603,"开关箱中漏电保护器的额定漏电动作电流不应大于30m A，地下室、潮湿或有腐蚀介质的场所，其漏电保护器的额定漏电动作电流不应大于（ ）m A，其额定漏电动作时间均不应大于0.1S。",[484,486,487,489],{"key":20,"text":485,"correct":22},"5",{"key":24,"text":288,"correct":22},{"key":27,"text":488,"correct":32},"15",{"key":30,"text":490,"correct":22},"25",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1164604,"开关箱中的隔离开关只可直接控制照明电路和容量小于（ ）KW的动力电路。容量>3.0KW的动力电路应采用断路器控制，操作频繁时还应附设接触器或其他启动控制装置。",[495,497,499,501],{"key":20,"text":496,"correct":32},"3.0",{"key":24,"text":498,"correct":22},"4.0",{"key":27,"text":500,"correct":22},"5.0",{"key":30,"text":502,"correct":22},"6.0",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":20,"analysis":33},1164605,"防护设施与外电线路之间的安全距离不应（ ）规定数值。防护设施应坚固、稳定。",[507,509,511,513],{"key":20,"text":508,"correct":32},"小于",{"key":24,"text":510,"correct":22},"大于",{"key":27,"text":512,"correct":22},"超过",{"key":30,"text":514,"correct":22},"高于",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1164606,"在建工程（含脚手架）的周边与外电架空线路的边线之间的（ ）安全操作距离应符合规定。",[519,521,523,525],{"key":20,"text":520,"correct":32},"最小",{"key":24,"text":522,"correct":22},"最大",{"key":27,"text":524,"correct":22},"最长",{"key":30,"text":526,"correct":22},"最宽",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},1164607,"特别潮湿场所、导电良好的地面、锅炉或金属容器内的照明，电源电压不得大于（ ）。",[531,532,533,535],{"key":20,"text":407,"correct":22},{"key":24,"text":405,"correct":22},{"key":27,"text":534,"correct":32},"12",{"key":30,"text":411,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1164608,"照明器具和器材的质量应符合国家现行有关强制性标准的规定，（ ）使用绝缘老化或破损的器具和器材。",[540,542,543,544],{"key":20,"text":541,"correct":32},"不得",{"key":24,"text":347,"correct":22},{"key":27,"text":349,"correct":22},{"key":30,"text":545,"correct":22},"能够得",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},1164609,"施工现场临时用电必须建立安全技术档案，并应由主管该现场的（ ）技术人员负责建立与管理，机械员应积极配合。",[550,552,554,556],{"key":20,"text":551,"correct":32},"电气",{"key":24,"text":553,"correct":22},"机械员",{"key":27,"text":555,"correct":22},"焊工",{"key":30,"text":557,"correct":22},"安全员",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},1164610,"配电柜（总配电箱）应装设电源隔离开关及（ ）、过载、漏电保护电器装置，电源隔离开关分断时应有明显可见分断点。",[562,564,565,567],{"key":20,"text":563,"correct":22},"线路",{"key":24,"text":399,"correct":22},{"key":27,"text":566,"correct":32},"短路",{"key":30,"text":568,"correct":22},"配电",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},1164611,"照明供电，一般场所宜选用额定电压为（ ）V的照明器。",[573,574,575,576],{"key":20,"text":407,"correct":22},{"key":24,"text":405,"correct":32},{"key":27,"text":411,"correct":22},{"key":30,"text":409,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1164612,"移动电气设备时，必须经（ ）切断电源并做妥善处理后进行。",[581,583,584,585],{"key":20,"text":582,"correct":32},"电工",{"key":24,"text":553,"correct":22},{"key":27,"text":555,"correct":22},{"key":30,"text":557,"correct":22},[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]