[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-826-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},826,"(机械员)专业管理实务 岗位知识","建筑工程",0,17,50,1013,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1165272,3,"判断题","临时用电工程应不定期检查。检查时，应复查接地电阻值和绝缘电阻值。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1165273,"照明系统宜使三相负荷平衡，其中每一单相回路上，灯具和插座数量不宜超过25个，负荷电流不宜超过15A。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1165274,"行程开关按其结构，可分为直动式、滚轮式、微动式和组合式。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1165275,"在施工现场专用变压器的供电的TN-s接零保护系统中，电气设备的金属外壳必须与保护零线连接。保护零线应由工作接地线、配电室（总配电箱）电源侧零线或总漏电保护器电源侧零线处引出。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1165276,"临时用电工程应定期按分部、分项工程进行检查，对安全隐患必须及时处理，并应履行复查验收手续。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1165277,"安装、巡检、维修或拆除临时用电设备和线路，必须由临时电工完成，并应有专人监护。临时电工的技术等级应同工程的难易程度和技术复杂性相适应。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1165278,"停电操作顺序为，总配电箱→分配电箱→开关箱。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1165279,"配电柜（总配电箱）应装设电源隔离开关及短路、过载、漏电保护电器装置，电源隔离开关分断时不需有明显可见分断点",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1165280,"等电位连接是接地故障保护的一项重要安全措施，实施等电位联结能大大提高接触电压（是指电气设备的绝缘损坏时，人的身体可同时触及的两部分之间的电位差），在保证人身安全和防止电气火灾方面有十分重要的意义。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1165281,"施工现场的临时用电电力系统可以利用大地做相线或零线。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1165282,"施工现场用电系统的接地、接零保护系统分TT系统和TN系统两大类。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1165283,"等电位连接是使电气装置各外露可导电部分和装置外可导电部分电位基本相等的一种电气连接措施。采用接地故障保护时，在建筑物内应作总等电位联结，当电气装置或其某一部分的接地故障保护不能满足规定要求时，尚应在局部范围内做局部等电位连接。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1165284,"照明变压器必须使用双绕组型安全隔离变压器，严禁使用自耦变压器。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1165285,"一般场所开关箱中漏电保护器的额定漏电动作电流应不大于30mA，额定漏电动作时间不大于0.1s。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1165286,"采用TN系统做保护接零时，工作零线（N线）必须通过总漏电保护器，保护零线（PE线）必须由电源进线零线重复接地处或总漏电保护器电源侧零线处，引出形成局部TN-s接零保护系统",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1165287,"临时用电组织设计及变更用电时，必须履行“编制、审核、批准”程序，由电气工程技术人员组织编制，经相关部门审核及具有法人资格企业的技术负责人批准后实施。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1165288,"每台用电设备应有各自专用的开关箱，必须实行“一机一闸”制，严禁用同一个开关电器直接控制二台及二台以上用电设备。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1165289,"当施工现场与外电线路共用同一供电系统时，电气设备的接地、接零保护应与原系统保持一致。不得一部分设备做保护接零，另一部分设备做保护接地。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1165290,"安全技术档案应由主管该现场的电气技术人员负责建立与管理，机械员应积极配合。其中“电工安装、巡检、维修、拆除工作记录”可指定临时电工代管，每周由项目经理审核认可，并应在临时用电工程拆除后统一归档。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1165291,"电气设备的金属外壳可能因绝缘损坏而带电，为防止这种电压危及人身安全而人为地将电气设备的外露可导电部分与大地作良好的连接称为保护接地。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1165292,"工作接地是为保证电力系统和设备达到正常工作要求而进行的一种接地，例如在电源中性点直接接地的电力系统中，变压器、发电机的中性点接地等。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1165293,"导线截面的选择主要是依据线路负荷计算结果，其它方面可不考虑。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1165294,"临时用电施工组织设计的现场勘测可与建筑工程施工组织设计的现场勘测工作同时进行，或直接借用其勘测资料。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1165295,"临时用电工程必须经编制、审核、批准部门和使用单位共同验收，合格后方可投人使用。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1165296,"绘制临时用电工程图纸，主要包括用电工程总平面图、配电装置布置图、配电系统接线图、接地装置设计图。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1165297,"在中性点直接接地的电力系统中，为了保证接地的作用和效果，除在中性点处直接接地外，还须在中性线上的一处或多处再做接地，称重复接地。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1165298,"各类用电人员应掌握安全用电基本知识和所用设备的性能，也可符合下列规定：1）使用电气设备前必须按规定穿戴和配备好相应的劳动防护用品，并应检查电气装置和保护设施，严禁设备带“缺陷”运转；2）保管和维护所用设备，发现问题及时报告解决；3）暂时停用设备的开关箱必须分断电源隔离开关，并应关门上锁；4）移动电气设备时，必须经电工切断电源并做妥善处理后进行。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1165299,"无法进行自然采光的地下大空间施工场所，应编制单项照明电方案。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1165300,"施工现场停、送电的操作顺序是：送电时，总配电箱→分配电箱→开关箱；停电时，开关箱→分配电箱→总配电箱。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1165301,"临时电工也可经过按国家现行标准考核合格后，持证上岗工作；机械员、设备操作人员等其他用电人员必须通过相关安全教育培训和技术交底，考核合格后方可进行用电",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1165302,"建筑起重机械备案是由建设主管部门根据规定，对产权单位的建筑起重机械进行登记编号，发给备案证明。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1165303,"全部设备应单独编制保养计划，机械员应重点关注保养落实情况，必要时，组织专业技术人员进行协助，并对保养质量进行检验。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1165304,"施工机械的所有检查不一定要有记录。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1165305,"安装单位依法取得建设主管部门颁发的相应资质，同时还必须取得建筑施工企业安全生产许可证，以保证安装拆卸的施工工程安全。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1165306,"施工机械设备安全检查的目的是查处机械安全隐患，整改是机械安全检查的重要组成部分，也是检查结果的归宿。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1165307,"施工企业与项目部根据自身的特点，要建立和完善各项机械管理制度，这是保证施工机械安全无事故的必要条件。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1165308,"施工机械设备保养计划中应明确保养的时间、需保养的内容、保养方法以及保养的具体要求。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1165309,"建筑起重机械在安装、使用过程中由于安装不到位，在安装后未经验收和检测情况下就投入使用，会存在很多安全隐患，甚至导致事故的发生。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1165310,"企业主要负责人要切实承担安全生产第一责任人的责任。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1165311,"对于塔式起重机、施工电梯等大型设备，每年都要制定维修保养计划。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1165312,"生产经营单位安全生产事故应急预案是国家安全生产应急预案体系的重要组成部分。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1165313,"由于施工机械的安全间接影响施工生产的安全，所以施工机械的安全指标应列人企业经理的任期目标。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1165314,"建筑起重机械经验收合格后方可投入使用，未经验收或者验收不合格的不得使用。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1165315,"按照安全事故致因理论，建筑机械事故发生的主要原因有：人的不安全行为、物的不安全状态、管理缺陷及自然因素。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1165316,"由机械专业部门单独组织、机械相关人员参加，针对机械安全存在的突出问题进行的单项检查是定期检查。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1165317,"建筑机械的非正常损耗是指机械在正常使用中导致机械早期磨损、事故损坏以及各种使机械技术性能受到损害或缩短机械使用寿命等现象。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1165318,"建设工程施工前，施工单位专职安全管理人员应当对有关安全施工的技术要求向施工作业班组、作业人员作出详细说明。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1165319,"建筑机械的选择应与工程的具体实际相适应。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1165320,"机械正确使用追求的高效率和经济性，可以建立在发生非正常损耗的基础上，否则就不是正确使用。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1165321,"高层建筑施工包括基础施工、结构施工、装修施工等。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]