[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1165360":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1165360,826,3,"判断题","建筑起重机械安装专项方案实施前，编制人员或项目技术负责人应当向现场管理人员和作业人员进行安全技术交底。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"专项方案实施前，编制人员或项目技术负责人应当向现场管理人员和作业人员进行安全技术交底并签字确认。",{"id":6,"name":21,"category":22,"favorite":23},"(机械员)专业管理实务 岗位知识","建筑工程",0]