[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1165349":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1165349,826,3,"判断题","因设计、结构、外部环境等因素发生变化确需修改专项方案的，因为不是安装单位原因造成的，修改后的专项方案不用重新审核。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"因设计、结构、外部环境等因素发生变化确需修改专项方案的，因为不是安装单位原因造成的，修改后的专项方案需用重新审核。",{"id":6,"name":21,"category":22,"favorite":23},"(机械员)专业管理实务 岗位知识","建筑工程",0]